Construindo confiança, garantindo o sucesso Portal do cliente dang.victor@worldsteelgroup.com +84 902 881 833
World SteelBuilding trust, Assuring success
Industrial park with ready-built steel factories and warehouses, rooftop solar and one phase under construction (illustration)

For project owners & industrial developers

Direct from the factory – your steel building, without the middle layers

Talk directly to the engineers who design your building, the plant that fabricates it and the team that answers for it. World Steel takes your factory, warehouse or lettable industrial building from concept to handover under one accountable contract – value-engineered, transparently priced, fully documented and built to last.

Request a quotationConheça a solução

1
Contract & point of responsibility
design · fabrication · supply · erection
Direct
Owner ↔ manufacturer
no trading or subcontract layers
≈ 40,000 t
Own fabrication capacity
a year, one certified plant
EXC3 · CC3
Certified fabrication
EN 1090-2 · AS/NZS 5131 · ISO 3834-2
Ready-built steel factory with office block, loading docks and trucks (illustration)

Why owners buy direct

From an owner's point of view, a steel building is bought three times: once in the price, once in the schedule and once in the years of operation that follow. Each extra layer between you and the factory – a trading company, a general contractor who subcontracts the steel, an agent – adds margin, adds a hand-over of information, and blurs who is responsible when something goes wrong.

Buying direct puts the decisions where they belong. The engineers who optimise your structure work in the same company as the plant that fabricates it; you see the bill of quantities, the inspection records and the programme first-hand; and one company answers for the building from the first drawing to the end of the warranty. For developers who build to lease, it also means a lettable building sooner – and a technical dossier that tenants, insurers and lenders can rely on.

What we deliver direct

Building types for project owners

Complete steel building packages – structure, roof and wall systems, platforms and accessories – from one plant.

Ready-built factories for leaseRBF

Ready-built factories for lease

Standardised units with office module, docks and canopies – flexible for different tenants and repeatable across phases.

Crane-ready & mezzanine-ready baystenant flexibility

Crane-ready & mezzanine-ready bays

Columns, corbels and runway provisions for future cranes; bays prepared for mezzanine floors and offices.

Phased industrial parksrepeatable

Phased industrial parks

One approved design repeated across phases – faster approvals, predictable cost and consistent quality.

Aplicações

What buying direct gives the owner

01

Cost without hidden layers

Price built from a transparent bill of quantities – steel tonnage, coatings, cladding and services itemised, without trading or subcontract margins stacked on top.

02

Engineering that saves steel

Value engineering by the people who also fabricate: grids, spans, frame types and connections optimised for weight, fabrication and erection together.

03

One point of responsibility

Design, fabrication, supply and erection under one contract – no gaps between designer, fabricator and erector to argue about.

04

Control of the schedule

Fabrication slots planned in our own plant, steel made in parallel with your civil works and shipped in erection sequence.

05

Quality you can verify

Third-party certified fabrication, an inspection and test plan with hold points you can witness, and traceable material certificates.

06

Documents that hold value

Calculations, approval and as-built drawings, quality records and warranty – the dossier for permits, tenants, insurers, lenders and a future sale.

Normas e conformidade

Codes we design and fabricate to

Local codes for projects in Vietnam; the codes of the destination market for export projects.

Vietnam

  • TCVN 5575Steel structures – design
  • TCVN 2737Loads and actions
  • QCVN 06:2022/BXDFire safety of buildings
  • Construction lawPermits, appraisal and acceptance by the competent authorities

United States

  • AISC 360 · ASCE 7Structural steel buildings · minimum design loads
  • AWS D1.1Structural welding code – steel
Todas as normas United States →

Australia & New Zealand

  • AS 4100 · AS/NZS 1170Steel structures · structural design actions
  • AS/NZS 5131 Certificação WSCFabrication and erection – construction category
Todas as normas Australia & New Zealand →

Europe

  • EN 1993 · EN 1991Eurocode steel design and actions
  • EN 1090-2 Certificação WSCExecution of steel structures – EXC2 / EXC3
Todas as normas Europe →

Resumo apenas para orientação – prevalecem a especificação do projeto, a edição da norma adotada e a autoridade competente.

What World Steel takes on

The problems we take off your desk

Agreed per contract – from a steel package to a complete building as general contractor.

Concept & value engineering

Before you commit

Layout, grid, frame and cladding options compared on total cost and lettability.

Design & calculations

Engineering

Structural design, connections and anchor bolts – see design and approval drawings.

Permit & fire-safety files

Approvals support

Technical drawings and calculations for the permit and the fire-safety appraisal.

Steel sourcing

Traceable

Mill-certified steel, EN 10204 3.1 certificates – see steel sourcing.

Fabrication & QA/QC

Own plant

Certified welding, inspection and test plan, NDT and dimensional checks.

Coating, roof & walls

Envelope

Surface protection, roof and wall sheeting, skylights, insulation, gutters and trims.

Packing & logistics

Delivery

Packing in erection sequence, transport and export documents – see export packing.

Erection or general contracting

Site

Steel erection, supervision, or the whole building as general contractor.

As-built & handover dossier

Handover

As-built drawings, quality records and maintenance information.

Solar-ready & green building

ESG

Roof capacity for rooftop solar, skylights, insulation and documents to support green-building certification of the project.

Tenant changes & expansions

Future phases

Crane, mezzanine and extension provisions designed in – and the same team for later changes.

Scope is defined in the contract; site civil works, foundations and utilities can be included under general contracting or remain with the owner's contractors.

Industrial developers

Factories and warehouses for lease: lettable sooner, attractive longer

For a developer, construction time is time without rent. We work from a standard building concept for your park – grid, clear height, spans, docks, office module – that is value-engineered once and repeated phase after phase, so each new phase is faster to design, approve and build than the last.

Because you do not yet know every tenant, we design for flexibility: crane-ready columns and corbels, mezzanine-ready bays, roof loads for rooftop solar, provisions for future extension and fire-safety concepts that suit a range of uses. The result is a building that leases faster today and stays easy to re-let tomorrow.

Industrial park with rows of ready-built factories, roads and truck docks (illustration)
Steel portal frames under erection next to a completed bay (illustration)

Value engineering

The cheapest steel is the steel you do not need

Most of a steel building's cost is decided before the first plate is cut – by the grid, the spans, the frame type, the connection design and the cladding system. Our engineers compare options early: portal frames or trusses, tapered or rolled sections, bay spacing, purlin and girt systems, bolted connections that erect quickly.

Because design and fabrication sit in one company, every option is judged on total cost – material, fabrication hours, coating area, transport and erection time – not on tonnage alone. See consulting & value engineering.

Transparency & control

You stay in control – without having to chase anyone

A direct relationship only works if you can see what is happening. You get one project manager, a programme with milestones, and regular reports with photos from design, fabrication, coating, packing and site. Hold points in the inspection and test plan can be witnessed by you or your third-party inspector, in person at our plant or online.

Changes are handled through a written change procedure with cost and time impact agreed before work proceeds, and payments are linked to clear deliverables – approved drawings, fabricated tonnage, shipments and erection progress – so value is always ahead of payment risk.

Factory interior with mezzanine, stairs and production bays (illustration)
Steel factory building ready for handover (illustration)

Documents & approvals

A dossier that permits, tenants and lenders accept

Owners often discover at handover that the documents are missing. We plan the dossier from day one: structural calculations and drawings for the permit application, coordination with the fire-safety design for appraisal, material certificates, welding and coating records, as-built drawings and the operation and maintenance information for the building.

In Vietnam, the steel design follows TCVN 5575 and the loads TCVN 2737, coordinated with the fire-safety requirements of QCVN 06:2022/BXD; for export projects we work to the codes of the destination. Permits, fire-safety appraisal and acceptance are issued by the competent authorities – we prepare and support the technical files within our scope.

Compare the models

Direct from the factory vs the usual alternatives

A qualitative comparison of procurement routes for the steel building package – the right route depends on the project, but the differences are structural.

Procurement models for a steel building – owner's perspective
What matters to the ownerDirect from World SteelGeneral contractor / EPC subcontracting the steelTrading company or agentSmall local workshop
Who designs the steelOur engineers – optimised with fabricationConsultant or subcontractor, often separateSupplier's standard, little project inputOften the owner's designer only
Who fabricatesOur own certified plantA subcontractor chosen by the contractorA third-party factory you may not seeThe workshop, limited capacity
Price transparencyItemised BOQ, tonnage and scopeLump sum with contractor marginUnit price plus trading marginSimple, but scope gaps common
Cost layersManufacturer onlyFabricator + contractorFabricator + traderWorkshop only
Responsibility for defectsOne company, design to warrantyContractor, passed down the chainOften unclear after deliveryLimited by the workshop's means
Schedule controlOwn production planning, parallel fabricationDepends on the subcontractor's queueDepends on the factory's queueLimited by capacity
Quality evidenceISO 3834-2, EN 1090 EXC3, AS/NZS 5131 CC3, ITP, NDTVaries with the subcontractorCertificates of an unseen factoryUsually limited records
Technical dossierCalculations, drawings, records, as-builtAssembled from several partiesOften incompleteOften minimal
Direct access to engineersYes – same team from offer to handoverThrough the contractorThrough the traderYes, with limited engineering

Your concerns, answered

What owners worry about – and how we handle it

The questions we hear most often from investors and developers before they sign.

Owner concerns and World Steel's approach
ConcernWhat can go wrongHow World Steel handles it
Is the design right – and not over-designed?Unsafe or wasteful structure, unsuitable for tenantsDesign basis agreed in writing, value-engineering options, calculations and drawings for your review and approval
Will the price hold?Scope gaps and change ordersItemised BOQ, clear inclusions and exclusions, written change procedure before any extra work
Will it be on time?Late steel stops the whole siteProgramme with milestones, fabrication planned in our own plant, parallel to civil works, shipped in erection order
Is the quality real?Poor welds, coating failures, misfits on siteISO 3834-2, EN 1090 EXC3, AS/NZS 5131 CC3 certified plant; ITP with hold points you can witness; NDT and coating records
Will the documents be complete?Permits, acceptance or sale delayedDossier planned from day one: calculations, approval and as-built drawings, certificates, QA records
Will the roof leak?Tenant complaints, damaged goodsRoof system, slopes, gutters, flashings and penetrations detailed and checked; installation supervised
Fire safety and insurance?Appraisal comments, insurer requirementsSteel design coordinated with the fire-safety design; fire protection systems where required
Who answers after handover?Nobody takes responsibilityOne manufacturer and one contact for warranty and after-sales support

Processo

How we work with owners – step by step

  1. 1

    1 · Brief & site

    Your use, tenants, budget, programme and site data.

  2. 2

    2 · Concept & options

    Layouts and structural options compared on total cost.

  3. 3

    3 · Proposal & BOQ

    Itemised quotation, scope, programme and payment milestones.

  4. 4

    4 · Contract & design basis

    Codes, loads, tenant provisions and deliverables fixed in writing.

  5. 5

    5 · Design & approvals

    Calculations and drawings for your approval and the permit files.

  6. 6

    6 · Fabrication & QA

    Own plant, ITP hold points open to you and your inspector.

  7. 7

    7 · Coating & packing

    Protection for the exposure; packed in erection sequence.

  8. 8

    8 · Delivery & erection

    Shipped to the programme; erection or supervision on site.

  9. 9

    9 · Handover

    As-built drawings, records and maintenance information.

  10. 10

    10 · Warranty & next phase

    Support after handover – and a faster start on your next phase.

FAQ

Perguntas frequentes

Why should an owner buy the steel building direct from the factory?

Fewer layers mean fewer margins and fewer hand-overs of information. The owner deals directly with the engineers and the plant, sees the bill of quantities and the quality records first-hand, and has one company responsible from design to warranty.

Can World Steel deliver the whole building, not only the steel?

Yes. We can supply the steel package with roof and wall systems, erect it, or act as general contractor for the complete building. The scope is agreed in the contract.

We are building factories for lease and do not know the tenants yet. How do you design for that?

We agree a flexible design basis: crane-ready columns, mezzanine-ready bays, roof capacity for solar panels, provisions for extension and a fire-safety concept that suits several uses – so the building can be let and re-let without major changes.

How do you keep the price under control?

With an itemised bill of quantities, clear inclusions and exclusions, and a written change procedure – cost and time impacts are agreed before any change is carried out.

Can we inspect the fabrication?

Yes. The inspection and test plan lists hold and witness points; you or your third-party inspector can attend at our plant in Tay Ninh or follow online, and receive the inspection records.

Do you prepare the documents for permits and fire-safety appraisal?

We prepare the structural calculations and drawings and coordinate with the fire-safety design for the permit and appraisal files within our scope. Approvals are issued by the competent authorities.

What happens after handover?

You receive the as-built drawings, quality records and maintenance information, and keep one contact at World Steel for warranty and after-sales support.

Do you work outside Vietnam?

Yes. We export steel buildings and structures to more than 30 countries, designed and fabricated to the codes of the destination market.

Building a factory, a warehouse or an industrial park?

Send us your site plan, the use or tenant brief and your programme – we propose the concept, the structural options and an itemised quotation, direct from the factory.

Request a quotation +84 902 881 833