Construyendo confianza, asegurando el éxito Mi portal dang.victor@worldsteelgroup.com +84 902 881 833
World SteelBuilding trust, Assuring success

EXW

Ex Works

The buyer collects at the seller's premises and does everything else – loading, export clearance and all transport.

Bajo pedidoCualquier modo de transporteIncoterms® 2020

FábricaWSDespachode exportaciónPuertode cargaAbordoTransporteprincipalPuertode descargaDespachode importaciónSuobraEXWWorld Steel (vendedor) asume el riesgoEl comprador asume el riesgoCostos aún pagados por el vendedorTransmisión del riesgo

Cómo entrega World Steel en EXW

Available at the World Steel factory, Hai Son Industrial Park, on request. Because EXW leaves loading and Vietnamese export clearance to the buyer, we normally recommend FCA World Steel factory instead – export cleared and loaded by us.

Entrega
Goods placed at the buyer's disposal at the named place – the WS factory – not loaded.
Transmisión del riesgo
When the goods are placed at the buyer's disposal at the factory.
Costos
The buyer pays from the factory gate, including loading and Vietnamese export clearance.
Ideal para
Domestic collection, or buyers with their own export agent in Vietnam.
Atención
The buyer must be able to clear exports in Vietnam; the seller has no duty to load. ICC recommends FCA for international sales.

Indique siempre la regla, un lugar designado preciso y la versión, p. ej. “EXW Ho Chi Minh City, Incoterms® 2020”.

Incoterms® is a registered trademark of the International Chamber of Commerce (ICC). This page summarises the Incoterms® 2020 rules for orientation only – the ICC text and the sales contract govern. Always state the rule, the named place and “Incoterms® 2020”.

Cotice su proyecto en EXW

Indíquenos el destino y el Incoterm preferido – cotizamos en fábrica, FOB, CIF o entregado en obra.

Solicitar cotización