A certified structural steel fabrication plant producing around 40,000 tonnes a year for projects on five continents – laser cutting, automatic welding, blasting and painting under one roof, with a QC release at every one of twelve production steps.

צפו בסרט המפעלהתהליך שלנו ב-12 שלבים

≈ 40,000 t
Fabrication capacity per year
12 steps
QC release at every step
30+
Export countries
EXC3 · CC3
EN 1090 · AS/NZS 5131
ISO 3834-2 · IAS AC472 · BC1

סרט המפעל

See the factory in motion

Take a walk through the plant – from steel plate arriving at the gate to finished, coded members leaving for the port.

World Steel factory – company filmWorld Steel factory – company filmסרט המפעל – בקרוב
Laser cuttingLaser cuttingסרט המפעל – בקרוב

Plates, end plates and holes cut by laser.

Automatic weldingAutomatic weldingסרט המפעל – בקרוב

Built-up members assembled and welded automatically.

Blasting & paintingBlasting & paintingסרט המפעל – בקרוב

Surface preparation and paint systems.

Packing & dispatchPacking & dispatchסרט המפעל – בקרוב

Coded, bundled and loaded for export.

Automatic welding of a built-up steel member in the World Steel factory

One plant, one quality system, every market

The World Steel factory at Hai Son Industrial Park, Duc Hoa, Tay Ninh Province, close to the container ports of Ho Chi Minh City, is where our structural steel and pre-engineered buildings are made – from the largest built-up members to the smallest fittings, including oversize and special structures.

Fabrication runs under quality and welding management systems recognised in our export markets: AS/NZS 5131 CC3 for Australia and New Zealand, EN 1090-2 EXC3 with CE marking for Europe, ISO 3834-2 for welding quality, IAS AC472 for the United States and BC1 for Singapore. World Steel was the first company in Asia accredited under IAS AC472.

The plant at a glance

Location
Hai Son Industrial Park, Duc Hoa, Tay Ninh Province, Vietnam
Capacity
≈ 40,000 tonnes of structural steel per year
Products
Built-up and hot-rolled structural steel, PEB frames, secondary members, steel products
Cutting
Laser cutting of plate, end plates and holes
Welding
Automatic welding of built-up members, SAW and FCAW
Surface
Shot blasting and paint systems to specification; hot-dip galvanizing on request
Quality
QC release at each of 12 steps · ISO 3834-2 · EN 1090 EXC3 · AS/NZS 5131 CC3

ייצור

What the factory produces

One plant for primary steel, secondary members and steel products.

Built-up members

Built-up members →

Tapered frames, plate girders, box columns and crane girders made from laser-cut plate and automatically welded.

Steel products

Steel products →

Stairs, platforms, grating, handrails, ladders, pipe racks and miscellaneous metals.

תהליך

Our 12-step production process

Each step is carried out by trained workers, supported by production supervisors and checked by QC before the member moves on.

Our 12-step production process
  1. 01

    Material receiving & inspection

    Steel plate arrives at the factory and is checked against the purchase order and the mill certificates – grade, thickness, dimensions, surface condition and heat number – before it is released to production.

    ציוד Overhead cranes for unloading; measuring tools for thickness and dimensions.

    • עובד מבצע
    • מפקח תומך
    • QC מאשר

    בדיקת QC Grade, size and heat number verified against EN 10204 3.1 certificates; heat numbers recorded for traceability.

    Material receiving & inspection
  2. 02

    Laser cutting

    Web and flange plates are cut by laser, and end plates, stiffeners and connection plates are cut and their holes made by laser in the same operation – accurate parts with clean edges and precise hole positions.

    ציוד CNC laser cutting with nesting from the shop-drawing data.

    • עובד מבצע
    • מפקח תומך
    • QC מאשר

    בדיקת QC Part dimensions, hole positions and cut-edge quality checked on the first piece and by sampling; parts marked with their codes.

    Laser cutting
  3. 03

    Fit-up & automatic welding

    The web and the two flanges are fitted up and joined by automatic welding along the full length of the member, under qualified welding procedures.

    ציוד Automatic H-beam line with submerged-arc welding (SAW).

    • עובד מבצע
    • מפקח תומך
    • QC מאשר

    בדיקת QC Fit-up, welding parameters, procedure and weld size checked; welds visually inspected.

    Fit-up & automatic welding
  4. 04

    Straightening

    Welding heat distorts flanges and members, so every built-up member is straightened – flange tilt and camber corrected – to the fabrication tolerances.

    ציוד Flange straightening machine.

    • עובד מבצע
    • מפקח תומך
    • QC מאשר

    בדיקת QC Flange squareness, straightness and camber measured against tolerance.

    Straightening
  5. 05

    Rough assembly

    End plates at both ends, stiffeners and other fittings are positioned and tack-welded to the member according to the shop drawings.

    ציוד Assembly beds and overhead cranes.

    • עובד מבצע
    • מפקח תומך
    • QC מאשר

    בדיקת QC Positions, orientation and part codes checked against the shop drawing before welding.

    Rough assembly
  6. 06

    Dimensional inspection נקודת עצירה

    A formal hold point: QC measures the assembled member – length, depth, end-plate positions and hole patterns, squareness – before any final welding is done, so errors are corrected while correction is still easy.

    • עובד מבצע
    • מפקח תומך
    • QC מאשר

    בדיקת QC Dimensional report against the shop drawing; member released for final welding only after approval.

    Dimensional inspection
  7. 07

    Final welding

    After the dimensional release, all detail welds – end plates, stiffeners, cleats and fittings – are completed by qualified welders to the welding procedure specifications.

    ציוד SAW and FCAW welding equipment.

    • עובד מבצע
    • מפקח תומך
    • QC מאשר

    בדיקת QC Welder qualification, WPS and weld sizes checked; welding records completed.

    Final welding
  8. 08

    Visual inspection, grinding & deburring

    Every weld is visually inspected, weld spatter and defects are ground, sharp edges and burrs are removed – a clean surface ready for blasting and coating.

    ציוד Grinders; UT, MT and PT equipment where testing is specified.

    • עובד מבצע
    • מפקח תומך
    • QC מאשר

    בדיקת QC 100 % visual inspection; UT, MT or PT where the specification requires; NDT reports issued.

    Visual inspection, grinding & deburring
  9. 09

    Shot blasting

    Members are shot-blasted to remove mill scale and rust and to give the surface profile the paint system needs.

    ציוד Shot blasting machine.

    • עובד מבצע
    • מפקח תומך
    • QC מאשר

    בדיקת QC Surface cleanliness (e.g. Sa 2½) and roughness checked before painting.

    Shot blasting
  10. 10

    Painting

    The specified paint system is applied – primer, intermediate and top coats as required – within the paint manufacturer's limits for temperature and humidity.

    ציוד Spray painting equipment; wet and dry film thickness gauges.

    • עובד מבצע
    • מפקח תומך
    • QC מאשר

    בדיקת QC Dry film thickness (DFT) measured; adhesion and appearance checked where specified; coating report issued.

    Painting
  11. 11

    Packing

    Members are marked with their package codes, bundled and protected for transport, and packing lists are prepared for every bundle and container.

    ציוד Overhead cranes, timber dunnage, steel support frames and strapping.

    • עובד מבצע
    • מפקח תומך
    • QC מאשר

    בדיקת QC Piece counts, marks, protection and packing lists checked against the shipping list.

    Packing
  12. 12

    Dispatch

    Goods are loaded on trucks or into containers and flat racks and released from the factory to site or to the port, with the delivery and quality documents.

    ציוד Cranes and lifting equipment for loading trucks, containers and flat racks.

    • עובד מבצע
    • מפקח תומך
    • QC מאשר

    בדיקת QC Final release note; loading checked; quality dossier compiled.

    Dispatch

בקרת ייצור

Three roles at every step

No step in our factory is finished just because the work is done. Every step is performed by a worker, supported by a production supervisor and checked by a QC inspector – and only QC releases the member to the next step.

If a check fails, the member goes back for repair and re-inspection. The result is quality built in step by step, not inspected in at the end – and a complete record for every member.

WorkerPerforms the step to the shop drawings and welding procedures.
Production supervisorSupports the team, sets up the line, resolves issues and keeps the schedule.
QC inspectorInspects, records and releases – or holds the member for correction.
Three roles at every step

מכונות וציוד

Machinery & equipment

Production equipment for every step from plate to dispatch – the same machines that make your members.

CNC laser cutting01
Cutting

CNC laser cutting

Web, flange and connection plates cut by laser – holes, slots and copes made in the same operation, from nested CNC data.

Automatic H-beam lines02
Built-up members

Automatic H-beam lines

Web and flanges fitted up and joined by submerged-arc welding along the full member length – tapered and prismatic members.

Flange straightening03
Straightening

Flange straightening

Flange tilt and camber from welding corrected to the fabrication tolerances of the project code.

Assembly & welding bays04
SAW · FCAW

Assembly & welding bays

End plates, stiffeners and fittings assembled to the shop drawings and welded by qualified welders to approved procedures.

Shot blasting05
Surface preparation

Shot blasting

Mill scale and rust removed to Sa 2½ with the roughness profile the paint system needs.

Painting area06
Coating

Painting area

Primer, intermediate and topcoats applied within the paint manufacturer's limits for temperature and humidity.

Roll forming07
Purlins · sheeting

Roll forming

C and Z purlins, girts and profiled roof and wall sheeting formed, cut to length and bundled at the machine.

Cranes & handling08
Lifting

Cranes & handling

Overhead cranes in the workshops and lifting equipment in the dispatch yard move members safely between steps.

Inspection & testing09
QC · NDT

Inspection & testing

Dimensional measuring tools, coating thickness gauges and UT, MT and PT equipment for weld testing where specified.

Packing & dispatch10
Export

Packing & dispatch

Steel container support frames, dunnage and strapping – loaded and braced for trucks, containers and flat racks.

Equipment shown by function. Numbers of units and capacities are confirmed for each project audit and factory visit.

Quality you can trace

איכות

Quality you can trace

Quality at World Steel is a chain of recorded checks from plate to dispatch – material traceability by heat number, first-piece checks in cutting, welding records, a dimensional hold point, visual inspection and NDT, coating thickness and packing control.

All records come together in the quality dossier delivered with the project, and our certifications are maintained by regular surveillance audits by independent bodies – see Europe, Australia and US standards.

תוכנית בדיקה וניסוי

What QC checks – from plate to dispatch

A typical inspection and test plan for a structural steel project. The project ITP follows your specification and is agreed before fabrication.

שלבמה נבדקשיטה / תקןרשומה
01Incoming materialGrade, thickness, dimensions, surface, heat numberMill certificates EN 10204 3.1 against the order and specificationReceiving record · heat-number log
02CuttingPart dimensions, hole positions, cut-edge qualityFirst-piece check and sampling against shop drawingsCutting check record
03Fit-up & weldingFit-up, welding parameters, procedure, welder qualificationQualified WPS and welders to the project code (ISO 15614-1 / ISO 9606-1, AWS D1.1, AS/NZS 1554.1)Welding record
04StraighteningFlange tilt, straightness, camberMeasured against the code tolerancesDimensional record
05Dimensional inspection נקודת עצירהLength, depth, end plates, hole patterns, squarenessMeasured against the shop drawing before final weldingDimensional report · release for final welding
06Weld inspectionAll welds visually; NDT to the specified extentVisual ISO 17637; UT ISO 17640, MT ISO 17638, PT ISO 3452-1 – or AWS D1.1 equivalentsVisual and NDT reports
07Surface preparationCleanliness, dust, roughness profileISO 8501-1 (Sa 2½), ISO 8502-3, ISO 8503Blasting record
08CoatingDry film thickness, appearance; adhesion where specifiedISO 19840 / SSPC-PA 2; ISO 4624 pull-off where specifiedCoating report
09Packing & dispatchPiece counts, marks, protection, loading and bracingShipping list and the export packing procedurePacking list · photos · release note
10Quality dossierAll records complete and traceable to the heatCompiled to the contract requirementsManufacturing data record (MDR)

Tolerances and test extents follow the project code – EN 1090-2, AS/NZS 5131, AISC 303 / AWS D1.1 or the specification. All records go into the quality dossier (MDR).

לוגיסטיקה

From our gate to your site

Every member carries its package code, so it can be found in the packing list, on the container plan and on site. Bundles are protected and loaded for 20 ft and 40 ft containers, flat racks or break-bulk, with oversize members planned with the forwarder.

The plant is a short road trip from the container ports of Ho Chi Minh City – see export supply & logistics and our market guides.

From our gate to your site

בטיחות, גיהות וסביבה

Safety, people and environment

01

Safety first

Safety rules, protective equipment and toolbox talks on every shift; lifting and hot-work procedures in all workshops.

02

Trained people

Qualified welders, inspectors and supervisors with continuous on-the-job training.

03

Environment

Waste, dust and paint handled under site procedures; housekeeping and safety walks in every workshop.

04

Housekeeping

Clean, organised workshops – a safer workplace and better quality.

בקרו אותנו

Visit the factory

Clients, consultants and certification bodies are welcome to audit the plant, witness inspections or attend a factory acceptance test. Virtual tours by video call can be arranged for overseas clients.

Book a factory visit

מפעל הייצור של World SteelHai Son Industrial Park, Duc Hoa, Tay Ninh Province, Vietnam +84 902 881 833 dang.victor@worldsteelgroup.com פתיחה ב-Google Maps ↗

FAQ

שאלות נפוצות

Where is the World Steel factory?

At Hai Son Industrial Park, Duc Hoa, Tay Ninh Province, Vietnam – close to the container ports of Ho Chi Minh City.

What is the factory's capacity?

Around 40,000 tonnes of structural steel per year, from the largest built-up members to small fittings.

How is quality controlled in production?

Through a 12-step process in which every step is performed by a worker, supported by a production supervisor and checked by QC before release to the next step – including a formal dimensional hold point before final welding.

Which cutting and welding processes do you use?

Laser cutting for plates, end plates and holes; automatic welding of built-up members; SAW and FCAW welding under qualified procedures; then straightening, final welding, grinding, shot blasting and painting.

What machinery does the factory use?

CNC laser cutting, automatic H-beam lines with submerged-arc welding, flange straightening, assembly and welding bays for SAW and FCAW, shot blasting, painting, roll forming for purlins and sheeting, overhead cranes, and inspection and NDT equipment – see the machinery section on this page.

Can we see the inspection and test plan for our project?

Yes. A project ITP based on your specification is agreed before fabrication, and every record – from mill certificates to coating reports – is delivered in the quality dossier.

Can we visit or audit the factory?

Yes. Clients, consultants and certification bodies can visit, audit or witness inspections; virtual tours by video call can also be arranged.

See it for yourself

Book a factory visit, a virtual tour or a witness inspection – or send us your drawings for a fabrication proposal.

Book a factory visit +84 902 881 833