Structural concept
Portal, truss, multi-span or multi-storey frames; spans and bay spacing compared for weight and cost.

Service · Consulting & value engineering
Most of the cost of a steel structure is fixed at concept stage – by the frame type, spans, loads, member types, coating and the way it is delivered and erected. Our engineers join you before the contract, compare the options side by side and give you a safe, compliant and economical basis to decide on.

Changing a span, a frame type or a coating system costs nothing on paper and a great deal once the steel is bought. That is why we bring engineering, fabrication, logistics and erection experience to the table at concept stage – when the decisions still move the price.
You receive clear options rather than a single answer: what each one weighs, what it costs to fabricate, ship and erect, how long it takes and what it means for your foundations and future use. You decide; we design what you choose.
Consulting services
Each option is checked to the code of your market and priced on the same basis.
frames · spans · bays
Portal, truss, multi-span or multi-storey frames; spans and bay spacing compared for weight and cost.
loads · climate
Design code, loads, wind, seismic and climate data agreed for your market – the foundation of a reliable price.
tonnage · cost
Budget tonnage and cost from concept drawings, refined into proposal drawings with the quotation.
grades · mills
Steel grades, sections and origin matched to the specification and any origin rules – see steel sourcing.
ISO 12944
Paint, galvanizing or duplex systems compared for durability and cost – see coating & protection.
Incoterms · erection
Incoterms, shipping, packing and erection options set out so you can compare offers on a like-for-like basis.
יישומים
Members sized to the forces – tapered and built-up sections where they save weight, hot-rolled where they save labour.
Sections, plates and connections that fabricate efficiently and bolt up quickly at site.
Member lengths and packing planned for containers or break-bulk to your port.
Protection chosen for the corrosivity and life you need – not more, not less.
Frame options compared for column reactions as well as steel weight.
Design, supply, erection and local works split so nothing falls between contracts.
Options, not opinions
For each alternative we set out the same facts: steel weight, fabrication and coating effort, shipping volume, erection time, column reactions and the risks. A tapered built-up frame may save steel; a hot-rolled frame may save fabrication time; a wider bay may reduce columns and foundations but add purlin weight. Seeing them together is what makes the choice yours.


From advice to design
The engineers who advise you are the team that designs and details the structure, so nothing is lost between consultant and fabricator. The agreed option becomes the proposal drawings with our quotation, then the approval drawings and the full design after the contract.
Reference
Qualitative guidance – the effect of each choice is calculated for your project.
| Decision | Mainly affects | Decided with |
|---|---|---|
| Frame type and spans | Steel weight, foundations, internal space | Owner, architect, our engineers |
| Bay spacing | Number of frames, purlin and girt weight | Our engineers |
| Built-up or hot-rolled members | Weight, fabrication effort, lead time | Our engineers and factory |
| Connection types | Fabrication and erection time | Our engineers and erectors |
| Coating system | Life to first maintenance, cost | Owner, specifier |
| Member lengths and packing | Shipping volume, site handling | Our export team |
| Scope split and Incoterms | Interfaces, risk, total cost | Owner, contractors |
תהליך
Your use, site, size, budget and programme – drawings or a sketch are enough.
Code, loads and climate data for your market agreed.
Frame, member, coating and delivery alternatives compared side by side.
The chosen option issued as proposal drawings with the quotation.
Scope and design basis fixed; design and approval follow.
תנאי אספקה · Incoterms® 2020
World Steel מתמחרת ממפעל, חופשי על סיפון או עד הנמל או האתר שלכם. אריזת יצוא, מסמכים ומשלוח מהו צ'י מין סיטי הם חלק מהשירות שלנו.
השוואת כל כללי Incoterms® 2020 →FAQ
Early advice and options for a qualified enquiry are part of our quotation service. Larger studies are agreed case by case.
The site location, use of the building, main dimensions and any architectural drawings or specification. A sketch is enough for a first comparison.
No. Every option is designed and checked to the code of your market; value engineering removes steel that does no work, not safety margins.
Yes – we can review an existing design or specification and propose alternatives for your engineer to consider.
Send us your brief or concept drawings – we reply with options and a budget basis to decide on.