פרק 6 מתוך 13 · Section 7 · Clauses 7.1–7.6 · Clause 13.6 · Tables 7.4, 13.6, 13.6.2.2

Welding to AS/NZS 5131 and AS/NZS 1554

Welding under AS/NZS 5131 Section 7 and Clause 13.6: ISO 3834-2 at CC3, AS/NZS 1554 SP/GP welds, qualified welders and coordinators, and NDE.

CC3 and CC4 welding is recommended to follow AS/NZS ISO 3834.2Welders qualified to AS/NZS 2980 or ISO 9606-1, traceable to welds at CC3Welding coordinator competence aligned with ISO 14731 at CC3All welds visually scanned; SP welds get 20% visual examination at CC3UT and other NDE by AS ISO 9712 Level 2 personnel (or Level 1 supervised)

The framework: AS/NZS 5131 sits on top of AS/NZS 1554 and ISO 3834

AS/NZS 5131 does not replace the welding standards; it calls them up and adds controls linked to construction category. Clause 7.1.2 requires welding to comply with the relevant Part of AS/NZS 1554: Part 1 for general structures, Part 2 for stud welding, Part 4 for quenched and tempered steels, Part 5 for structures under high fatigue loading, and Part 7 for sheet steel. Clause 7.1.1 links the welding quality system to AS/NZS ISO 3834, recommending Part 4 for CC1, Part 3 for CC2, and Part 2 (comprehensive requirements) for CC3 and CC4. That is why an ISO 3834-2 certificate is one of the first documents an assessor asks a CC3 fabricator for.

Before welding starts, Clause 7.1.3 expects the construction specification and shop drawings to state, for every weld, its category, size, type, extent, required NDE and, if it differs, its construction category. Missing information should be raised as a request for information, not assumed – see specification and documentation.

Weld categories GP, SP and FP

AS/NZS 1554.1 defines two weld categories: GP (general purpose), for statically loaded welds with lower stress, and SP (structural purpose), for welds carrying higher design stress or dynamic loading where tighter imperfection limits apply. Where fatigue loading is severe, the designer can specify category FP under AS/NZS 1554.5 (or AS/NZS 1554.4 for quenched and tempered steels), which brings additional workmanship and inspection requirements (Clause 7.6.3). Under Table 7.4, CC1 is limited to GP, CC2 uses GP and SP, and CC3 and CC4 may involve GP, SP and FP. The designer – not the fabricator – nominates the category, and Clause 7.6.3 also expects the specification to state any extra execution measures assumed in the fatigue design.

Welding plan, procedures and personnel

Clause 7.2 recommends a welding plan as part of production planning, especially where later welds or parts will hide earlier welds, where lamellar tearing is a risk, for modifications to existing structures and for large complex fabrications. When the specification requires it, the plan covers WPS references, preheat and interpass, distortion control, sequence and stop–start locations, restraints, consumable handling, weld categories, weld identification and the cross reference to the ITP.

All production welding uses qualified procedures with a WPS complying with the relevant AS/NZS 1554 Part (Clause 7.4.1). Impact-tested procedures are tested at the lowest of the design service temperature, the specified test temperature or the steel standard's impact temperature, and weld-through primers are qualified at maximum film thickness.

Welding personnel and traceability by construction category – summary of Clause 7.4 and Table 7.4
ItemCC1 / CC2CC3 / CC4
Welding proceduresQualified to AS/NZS 1554Qualified to AS/NZS 1554, with procedure traceability to welds
WeldersQualified per the AS/NZS 1554 Part usedAS/NZS 2980 or AS/NZS ISO 9606-1, identified and traceable
Welding coordinatorCompetence per AS/NZS 1554 (CC2 may be assessed by interview)Knowledge aligned with ISO 14731 – e.g. AS 2214, IWS, IWT or IWE depending on the work
Production testsNot called up by 5131Where the specification requires them
Stud welding operatorsAS/NZS 1554.2AS/NZS 1554.2

Clause 7.4.3 requires welding coordination in all categories, by people with real knowledge of the processes, equipment and materials they supervise. Unless the specification says otherwise, the welding coordinator acts as examiner for welder qualification, and all welder test records must be available to the welding inspector.

Preparation and execution: what is checked on the shop floor

  • Joint preparation (7.5.1): matches the qualified procedure test, within AS/NZS 1554 fit-up limits, clean and dry; shop primer stays on fusion faces only if the procedure was qualified with it.
  • Consumables (7.5.2): stored and conditioned per AS/NZS 1554; hydrogen-controlled electrodes and fluxes go into an oven or quiver at 105 °C or more once unpacked; damaged consumables are discarded.
  • Environment (7.5.3): gas-shielded welding needs wind below 10 km/h unless shielded or qualified; below 0 °C metal temperature, preheat and qualification rules apply.
  • Preheat (7.5.5): determined from AS/NZS 1554, measured to AS ISO 13916, and applied to tack welds and temporary attachments too.
  • Temporary attachments (7.5.6): made to a WPS, never on beam tension flanges, removed and the area ground and checked by magnetic particle examination.
  • Tack welds (7.5.7): from CC2 upwards, made to a qualified procedure; cracked tacks removed.
  • Butt welds (7.5.9): full throat at ends, run-on/run-off tabs where specified; at CC3 and CC4 permanent backing must be made continuous by full penetration welds; back gouging to a U-groove of at least 5 mm root radius.
  • Finishing (7.5.15): arc strikes ground and checked by MT, spatter removed from CC2 upwards, slag removed; welds to be coated also meet Clause 9.8.

Changing weld locations or adding welds not shown on the drawings needs prior approval (Clause 7.5.4). Post-weld heat treatment, where specified, follows AS 4458; studs follow AS/NZS 1554.2. New Zealand adds seismic rules for continuity stiffeners, heat input and backing (Clauses 7.5.16–7.5.17).

Acceptance criteria and repairs

Clause 7.6.1 sets AS/NZS 1554 acceptance levels as the default, for the weld category nominated. An imperfection beyond those limits is a defect (Clause 13.6.2.5). It may be left only if a fracture mechanics or similar assessment, such as BS 7910, shows it is harmless and both principal and fabricator accept the method. Repairs use a qualified procedure, and repaired welds are re-examined to the original extent and method.

Inspection of welding under Clause 13.6

At CC3 and CC4 an inspection and test plan must address the full welding chain – from welding plan, WPS and welder qualifications through material and consumable identity, fit-up, parameters, preheat, tacking and back gouging to visual examination, NDE and acceptance (Clause 13.6.1.2). The ITP names who inspects, at which stage, which welds and by what method and extent. Every inspection is recorded with inspector, item, weld, date, criteria and result (Clause 13.6.1.4).

Visual examination is done before other NDE, to AS/NZS ISO 17637, and includes checking that every specified weld is present (Clause 13.6.2.3). Other NDE follows its method standard – AS 2062 (PT), AS 1171 (MT), AS 2207 (UT), AS 2177 (RT) – and waits for the minimum hold time of Table 13.6.2.1, which increases with weld size, heat input and steel type. Clause 13.6.2.2 recommends heavier sampling at the start of each new WPS, a minimum of about 1 m of weld per WPS, and stepping up inspection whenever defects appear.

CC3 default NDE extent – our summary of Table 13.6.2.2(A); the construction specification overrides
Weld situation at CC3VisualVolumetric / surface
All welds100% visual scanningSurface testing (MT/PT) recommended where visual finds surface imperfections
Category SP weldsPlus 20% visual examination to AS/NZS 155410% UT of butt welds in tension flanges, cruciform joints and restrained joints near plate edges
Category FP welds100% visual examination to AS/NZS 1554As required by AS/NZS 1554.5 or 1554.4
AS 4100 earthquake design categories D and E (Australia)Greater of the above or Table 13.6.2.2(B)Table 13.6.2.2(B) raises butt welds in tension to full surface testing

Percentages are of weld length, and UT is generally unsuitable below about 10 mm thickness. Visual inspectors must be qualified as the AS/NZS 1554 Part requires; other NDE is carried out by AS ISO 9712 Level 2 personnel, or Level 1 under Level 2 supervision (Clause 13.6.1.3). See inspection and testing for the wider ITP.

For an offshore fabricator, the practical test is whether the records exist in English and link each weld to its WPS, welder, inspector and NDE report. Refer to the current edition of AS/NZS 5131 and AS/NZS 1554 for the full requirements.

רשימת בדיקה למעריך

מה מהנדס, קבלן או מבקר צריך לאמת אצל מסגריה בדרגת CC3 בחלק זה של AS/NZS 5131 – והראיות שיש לבקש.

סעיף · CCמה לאמתראיות
7.1.1 CC3–CC4Welding quality system meets AS/NZS ISO 3834.2 comprehensive requirements.ISO 3834-2 certificate and scope
7.1.3 CC1–CC4Weld category, size, type, extent and NDE are shown for each weld before welding starts.Shop drawings with weld symbols, categories and NDE notes; RFIs
7.4.1 CC1–CC4Production welds use qualified procedures to the relevant AS/NZS 1554 Part.WPS, PQR and procedure test reports
7.4.2 CC3–CC4Welders are qualified, current and traceable to the welds they made.Welder certificates to AS/NZS 2980 or ISO 9606-1, welder register, weld maps
7.4.3 CC3–CC4Welding coordination is by personnel with ISO 14731-level knowledge.Coordinator appointment, IWS/IWT/IWE or AS 2214 qualification
7.5.2 CC1–CC4Consumables are certified, conditioned and stored correctly, including 105 °C holding where required.Consumable certificates, oven and quiver temperature logs
7.5.5 CC1–CC4Preheat is applied per WPS, including for tacks and temporary attachments.Preheat records, temperature indicators
7.5.6–7.5.7 CC2–CC4Tack welds and temporary attachments made to qualified procedures and removal areas checked.Tack and attachment procedure, MT records after removal
13.6.1.2 CC3–CC4ITP covers the full welding chain, names inspectors and sets method and extent.Project ITP with hold and witness points
13.6.1.3 CC1–CC4Inspection and NDE personnel hold the required qualifications.Visual inspector certificates, AS ISO 9712 Level 2 NDT certificates
13.6.2 CC3NDE extent meets the specification or Table 13.6.2.2 defaults, after the required hold time.NDE reports with hold time, weld IDs, results; repair re-test records

במפעל שלנו

כיצד World Steel מיישמת זאת

01Welding to the specified categoryWorld Steel welds to AS/NZS 1554.1 at the SP or GP category specified on the drawings, using SAW, FCAW and GMAW processes under qualified procedures.
02ISO 3834-2 welding qualityWorld Steel's welding quality management is certified to ISO 3834-2 by Bureau Veritas, alongside its AS/NZS 5131 CC3 certification (BSI, certificate BMP 827566).
03Hold and witness pointsProject ITPs place welding inspection and NDE as hold or witness points, open to the client's inspector in person or by video.
04Records in the handover dossierWelding and inspection records form part of the manufacturer's data report and handover dossier issued with the Declaration of Compliance.

שאלות נפוצות

Does AS/NZS 5131 CC3 require ISO 3834-2 certification?

Clause 7.1.1 requires welding to follow the relevant part of AS/NZS ISO 3834 and recommends Part 2 for CC3 and CC4. Third-party certification is not mandated by the clause itself, but a certificate is the most direct evidence for an assessor. Project specifications often make it a requirement.

What is the difference between SP and GP welds?

Both are AS/NZS 1554.1 weld categories. GP suits lower-stressed, statically loaded welds; SP applies where design stress or dynamic loading is higher and has tighter imperfection limits and more inspection. The designer nominates the category for each weld.

How much ultrasonic testing is needed at CC3?

Unless the specification states otherwise, Table 13.6.2.2(A) recommends 10% UT on SP butt welds in tension flanges, cruciform joints and restrained joints near plate edges, plus 100% visual scanning and 20% visual examination of SP welds. FP welds follow AS/NZS 1554.5 or 1554.4. The construction specification should state the actual extent.

Who can perform NDE on a CC3 project?

Clause 13.6.1.3 requires NDE other than visual examination to be performed by AS ISO 9712 Level 2 personnel, or Level 1 under Level 2 supervision. Visual inspectors must meet the qualification rules of the relevant AS/NZS 1554 Part.