What it is
A gantry crane carries its girders on legs that run on rails at ground level, so no building or runway is needed. Gantries serve stock yards, precast and pipe yards, steel and timber yards, ports and hydropower intakes. Cantilevers on one or both sides extend the hook reach beyond the legs to load trucks or reach a second bay.
Types
- Single girder gantry – A-frame legs, underhung hoist; light to medium loads.
- Double girder gantry – box girders, trolley hoist between the girders; heavy loads.
- Gantry with cantilever on one or two sides – loading beyond the legs.
- Hydropower gantries – intake and spillway gate gantries with special hoists.
Outdoor design
Outdoor gantries are designed for wind in service and out of service, with rail clamps or storm anchors, weather-protected electrics (IP65 and up) and corrosion protection suited to the site.
Duty group
Vietnam: cranes are designed, manufactured and inspected to TCVN 4244:2005 and the lifting-equipment safety regulation QCVN 07:2012/BLĐTBXH, with technical inspection before use.
Normas e requisitos por mercado
Normas segundo as quais a World Steel projeta, fabrica e documenta este produto – e os principais requisitos geométricos e de carga em cada mercado.
Estados Unidos
- CMAA 70 / CMAA 74Top-running and single girder crane specifications
- ASME B30.2 · B30.17Overhead and gantry cranes – safety
- ASME B30.16 · ASME HST-4Overhead hoists
- OSHA 1910.179Overhead and gantry cranes
- Load test
- 125 % of rated load (ASME B30.2)
Austrália / NZ
- AS 1418.1Cranes – general requirements
- AS 1418.18Crane runways and monorails
- AS 2550.1Cranes – safe use
- AS 4100 · AS/NZS 1554.1Steel design and welding
- Registration
- Design and item registration per state WHS rules
Europa
- EN 15011Bridge and gantry cranes
- EN 14492-2Power-driven hoists
- EN 13001 seriesCrane design – general, actions, limit states
- Machinery DirectiveCE marking of the complete crane
- Load test
- Static 125 % and dynamic 110 % per EN 15011 / EN 14492-2
Resumo apenas para orientação – prevalecem a especificação do projeto, a edição da norma adotada e a autoridade competente.
Acabamentos
| Acabamento | Normas / observações |
|---|---|
| Paint | Blast cleaned, epoxy primer + polyurethane topcoat in safety yellow or project colour |
| Marking | Rated capacity and safety slogans on the girder in the client's language |
| Environment | Tropical, cold, high-temperature or chemical execution for hoists |
Perguntas frequentes
Do gantry cranes need a building?
No – the legs run on ground rails, which suits outdoor yards and sites where the building cannot carry a crane.