Xây dựng niềm tin, Bảo đảm thành công Cổng khách hàng dang.victor@worldsteelgroup.com +84 902 881 833
World SteelBuilding trust, Assuring success

WS overhead cranes, gantries & hoists

WS gantry cranes

WS single and double girder gantry cranes, with cantilevers on one or both sides – for stock yards, precast plants, steel yards and hydropower.

Hoa KỳÚc / NZChâu Âu

Yêu cầu báo giá Thông số kỹ thuật

  • Single or double girder
  • Cantilevers on one or two sides
  • Rail-mounted, with cable reel or conductor
  • Outdoor execution: wind, storm locks, IP65
  • Hydropower and special gantries

What it is

A gantry crane carries its girders on legs that run on rails at ground level, so no building or runway is needed. Gantries serve stock yards, precast and pipe yards, steel and timber yards, ports and hydropower intakes. Cantilevers on one or both sides extend the hook reach beyond the legs to load trucks or reach a second bay.

Types

  • Single girder gantry – A-frame legs, underhung hoist; light to medium loads.
  • Double girder gantry – box girders, trolley hoist between the girders; heavy loads.
  • Gantry with cantilever on one or two sides – loading beyond the legs.
  • Hydropower gantries – intake and spillway gate gantries with special hoists.

Outdoor design

Outdoor gantries are designed for wind in service and out of service, with rail clamps or storm anchors, weather-protected electrics (IP65 and up) and corrosion protection suited to the site.

Duty group

FEM and ISO duty groups for cranes and hoists
Duty groups – FEM 9.511 and ISO 4301.

Vietnam: cranes are designed, manufactured and inspected to TCVN 4244:2005 and the lifting-equipment safety regulation QCVN 07:2012/BLĐTBXH, with technical inspection before use.

Tiêu chuẩn và yêu cầu theo thị trường

Các quy chuẩn mà World Steel áp dụng để thiết kế, gia công và lập hồ sơ cho sản phẩm này – cùng các yêu cầu chính về hình học và tải trọng tại từng thị trường.

Hoa Kỳ

  • CMAA 70 / CMAA 74Top-running and single girder crane specifications
  • ASME B30.2 · B30.17Overhead and gantry cranes – safety
  • ASME B30.16 · ASME HST-4Overhead hoists
  • OSHA 1910.179Overhead and gantry cranes
Load test
125 % of rated load (ASME B30.2)
Tất cả tiêu chuẩn United States →

Úc / NZ

  • AS 1418.1Cranes – general requirements
  • AS 1418.18Crane runways and monorails
  • AS 2550.1Cranes – safe use
  • AS 4100 · AS/NZS 1554.1Steel design and welding
Registration
Design and item registration per state WHS rules
Tất cả tiêu chuẩn Australia & New Zealand →

Châu Âu

  • EN 15011Bridge and gantry cranes
  • EN 14492-2Power-driven hoists
  • EN 13001 seriesCrane design – general, actions, limit states
  • Machinery DirectiveCE marking of the complete crane
Load test
Static 125 % and dynamic 110 % per EN 15011 / EN 14492-2
Tất cả tiêu chuẩn Europe →

Nội dung chỉ mang tính tham khảo – chỉ dẫn kỹ thuật của dự án, phiên bản quy chuẩn được áp dụng và cơ quan có thẩm quyền là căn cứ quyết định.

Hoàn thiện bề mặt

Hoàn thiện bề mặtTiêu chuẩn / ghi chú
PaintBlast cleaned, epoxy primer + polyurethane topcoat in safety yellow or project colour
MarkingRated capacity and safety slogans on the girder in the client's language
EnvironmentTropical, cold, high-temperature or chemical execution for hoists

Câu hỏi thường gặp

Do gantry cranes need a building?

No – the legs run on ground rails, which suits outdoor yards and sites where the building cannot carry a crane.

Dự án tiếp theo

Bạn đang lên kế hoạch cho công trình kết cấu thép ở nước ngoài?

Gửi cho chúng tôi bản vẽ hoặc mô hình IFC – bộ phận dự toán sẽ phản hồi phạm vi gia công, tiến độ và giá giao hàng.