Pre-Engineered Steel Buildings (PEB)

Complete steel building systems – clear spans up to 100 m, built in a fraction of the time.

Pre-Engineered Steel Buildings (PEB)

Factories, warehouses and halls supplied as a complete system: primary frames, secondary members, cladding and accessories.

A pre-engineered building is designed for the client's architecture and loads, fabricated in the factory and erected on site with bolted connections. Components are produced in parallel and delivered to site in a short time, so a PEB is typically built in about one-third of the time of a conventional concrete building.

The light steel frame reduces foundation loads, and bolted connections make later extension simple. PEBs combine with metal cladding, brick, glass or timber finishes. World Steel was the first company in Asia to be certified under IAS AC472, the accreditation for metal building system manufacturers recognised by MBMA.

Đặc điểm & cấu kiện

  • Clear spans up to 100 m
  • Construction time about one-third of conventional concrete construction
  • Bolted connections for fast erection and easy future extension
  • Light frame – smaller foundations
  • Compatible with metal panels, brick, glass and timber finishes
  • Designed to MBMA / AISI practice; IAS AC472 certified manufacturer

Ứng dụng điển hình

  • Factories, manufacturing and assembly plants, steel rolling mills
  • Warehouses, logistics centres and cold storage
  • Supermarkets, showrooms, exhibition centres, gas stations
  • Schools, hospitals, airport terminals, railway stations
  • Greenhouses, livestock farms, sports centres and gyms

Câu hỏi thường gặp

How large can the clear span of a pre-engineered building be?

Clear spans of up to 100 m are possible; typical factory rafters span 30–50 m.

How much faster is a PEB than a concrete building?

Because components are fabricated in parallel and bolted together on site, construction time is typically about one-third of conventional concrete construction.

What is IAS AC472?

The IAS accreditation criteria for inspection programs of manufacturers of metal building systems, recognised by the Metal Building Manufacturers Association (MBMA). World Steel was the first company in Asia certified under AC472.