Solution · Kingposts & basement shoring for high-rise towers

Kingposts & basement shoring steel – the hidden frame that lets towers go down and up at the same time

Deep basements under city towers are built on steel you never see in the finished building: kingposts plunged into bored piles, struts and walers that hold back the diaphragm walls, and plunge columns that carry the floors in top-down construction. World Steel fabricates them to tight tolerances in its certified plant near Ho Chi Minh City and delivers them in step with the piling rig – proven on high-rise projects in the city centre.

Request a quotationاستكشف الحل

Top-down
Basement & tower in parallel
kingposts carry floors during excavation
2 towers
Kingpost references in HCMC
The Sun Tower · Southgate Tower
Built-up
Heavy H & box kingposts
full-penetration splices, UT tested
EXC3 · CC3
Certified fabrication
EN 1090-2 · AS/NZS 5131 · ISO 3834-2
Cut-away of a deep basement: diaphragm walls, three levels of steel struts and walers, and red kingposts supporting the struts (illustration)

What a kingpost does

A kingpost is a steel column installed into a bored pile before the basement is excavated. As the ground is dug out level by level, the kingposts stand free inside the pit and carry the loads above them: in a strutted excavation they support the steel struts that hold back the retaining walls; in top-down construction they carry the basement and ground-floor slabs – and often the first floors of the tower – until the permanent columns are completed around them.

Because a kingpost is installed blind into a pile and must line up with structure placed months later, it has to be straight, accurately dimensioned and fully documented. Splices, shear studs, slab connections and lifting points all have to be exactly where the designer put them. That is fabrication work for a certified steel plant – not for a site workshop.

What we fabricate

Steel for every basement construction method

Kingposts and shoring components fabricated to the designer's drawings and the piling contractor's installation method.

Plunge columns for top-downpermanent

Plunge columns for top-down

Heavy rolled or built-up H and box sections with shear studs, slab connection details and splices – later encased to become permanent columns.

Temporary kingpostsstrutted excavation

Temporary kingposts

Kingposts supporting strut levels in bottom-up basements, with brackets, stiffeners and cut-off marks for removal.

Struts, walers & corner bracesshoring system

Struts, walers & corner braces

H-section and built-up struts, double walers, corner braces, jack and preload seats, end plates and bracket connections.

Built-up & lattice kingpostsheavy loads

Built-up & lattice kingposts

Welded plate girders, box sections and laced columns where rolled sections are not enough – with full-penetration splices.

Studs, splices & connectionsinterface details

Studs, splices & connections

Shear studs, rebar holes and couplers, shear plates, splice plates and lifting lugs – placed to the designer's levels.

Sequenced deliveryjust in time

Sequenced delivery

Marked, sequenced loads delivered to inner-city sites in step with the piling rig and the excavation stages.

Why World Steel

Why contractors and developers choose World Steel for kingposts

Six reasons that matter when the basement programme depends on the steel arriving right and on time.

Real kingpost experience
01

Real kingpost experience

Kingpost packages delivered for The Sun Tower and Southgate Tower in Ho Chi Minh City – we know the details, the tolerances and the site constraints.

Heavy-section capability
02

Heavy-section capability

Built-up H and box sections, thick plates and long members fabricated with submerged-arc welding and CNC cutting and drilling.

Certified welding & NDT
03

Certified welding & NDT

ISO 3834-2, EN 1090 EXC3 and AS/NZS 5131 CC3 certified fabrication; qualified procedures and welders; UT of full-penetration welds.

Shop drawings from one model
04

Shop drawings from one model

Tekla model and shop drawings coordinated with slab levels, studs, couplers and strut connections – submitted for the engineer's approval.

Delivered in sequence
05

Delivered in sequence

Batches fabricated to the piling programme and delivered to inner-city sites within their delivery windows.

Complete documentation
06

Complete documentation

Mill certificates, welding and NDT reports and dimensional records for every kingpost – ready for the consultant and the owner.

التطبيقات

Why kingposts and steel shoring

01

Build down and up at the same time

In top-down construction the tower rises while the basement is excavated beneath it – the overall programme can be shortened significantly.

02

Protect neighbouring buildings

Floor slabs or stiff steel struts restrain the retaining walls level by level, limiting ground movement next to existing buildings, roads and services.

03

Fewer temporary works

Plunge columns become part of the permanent structure when encased; steel struts are bolted, removed and reused.

04

Clear working space

Long-span struts and few kingposts leave room for excavators, muck-away and concreting below.

05

Fast installation

Prefabricated, marked kingposts are lifted straight into the pile cage or plunge frame – no formwork, no curing time.

06

Predictable quality

Shop-fabricated welds, splices and studs with NDT and dimensional records instead of site improvisation.

المعايير والامتثال

Standards World Steel applies

Design by the project's structural engineer; fabrication, welding and inspection to the specified standards and our certified quality system.

Vietnam

  • TCVN 5575Steel structures – design standard (by the engineer)
  • TCVN 2737Loads and actions
  • Project specificationConsultant's specification governs tolerances, NDT and documents

Europe / international

  • EN 1993-1-1 · EN 1090-2Steel design · execution of steel structures, EXC2 / EXC3
  • ISO 3834-2 معتمد لدى WSCComprehensive quality requirements for fusion welding
  • EN ISO 15614-1 · ISO 9606-1Welding procedure and welder qualification
  • EN 10025 · EN 10204 3.1Structural steel (e.g. S355) · inspection certificates
جميع معايير Europe →

United States / Japan

  • AISC 360 · AWS D1.1Structural steel design · structural welding code
  • ASTM A572 · JIS G3106High-strength steel (Gr.50) · SM490 grades as specified
جميع معايير United States →

Australia & New Zealand

  • AS 4100 · AS/NZS 5131Steel structures · fabrication and erection, construction category
  • AS/NZS 1554.1Structural steel welding
جميع معايير Australia & New Zealand →

ملخص للاسترشاد فقط – تسري مواصفات المشروع وإصدار المعيار المعتمد والجهة المختصة.

Deliverables

What you receive with every kingpost package

Records that let the consultant approve, the piling contractor install and the owner archive with confidence.

Shop drawings

For approval

Every kingpost, strut and waler detailed with levels, studs, holes, splices and marks.

3D model

Coordination

Tekla model coordinated with slab levels, pile cages and strut layout.

Welding procedures

Qualified

WPS / PQR and welder qualifications for the project.

Material certificates

EN 10204 3.1

Plates and sections traceable to heat numbers.

NDT reports

UT · MT

Ultrasonic testing of full-penetration welds and splices, magnetic particle testing as specified.

Dimensional records

Straightness

Length, straightness, twist, end squareness and detail positions recorded.

Marking & delivery lists

Logistics

Piece marks, orientation, grid and sequence on every member and load.

Manufacturing data record

Handover

All records compiled per batch for the consultant and the owner.

Deliverables are agreed per contract; IFC models and DWG files on request.

Top-down construction

Floors first, excavation second – and the tower rises at the same time

In top-down construction the retaining walls and bored piles with plunged kingposts are installed first. The ground-floor slab is cast at the surface on the kingposts; excavation then continues beneath it through openings, and each basement slab is cast as the dig reaches its level. The slabs act as permanent struts for the walls, and the tower above can be built at the same time.

The kingposts carry the slabs – and part of the tower – until the permanent columns are completed by encasing them in concrete. Their capacity, straightness, splice positions and slab connection details are therefore critical, and are fabricated exactly to the structural engineer's design.

Top-down construction: ground and basement slabs supported by kingposts while the tower rises above and excavation continues below (illustration)
Fabricated built-up kingposts with splice plates and bolt groups on a basement site in Ho Chi Minh City

Precision

Straight, accurate and documented – because the kingpost goes in blind

Once a kingpost is plunged into wet concrete it cannot be adjusted. Verticality during installation is the piling contractor's task – our job is to deliver a member that makes it possible: controlled straightness and twist, accurate lengths and cut-off levels, square ends and precise splice geometry for long kingposts made in more than one piece.

Shear studs, holes for reinforcement, couplers, shear plates and brackets are positioned to the elevations of each future slab and marked on the member, together with orientation and grid reference. Full-penetration butt welds and splices are ultrasonically tested, and every kingpost leaves the plant with its dimensional and NDT records.

Proven in Ho Chi Minh City

Kingpost packages for city-centre towers

World Steel has fabricated and supplied the kingpost packages for The Sun Tower (Vietnam Capitaland Corporation, 2020) and Southgate Tower (Hong Ha Investment and Trade JSC, 2020) – high-rise projects in Ho Chi Minh City with deep basements on constrained urban sites.

Our plant in Hai Son Industrial Park, Tay Ninh, is within trucking distance of Ho Chi Minh City, so kingposts can be fabricated in batches and delivered in the order and the time windows that inner-city sites require.

Aerial view of a deep basement excavation in Ho Chi Minh City next to the Saigon River and high-rise towers

Compare

Basement construction methods and the role of the kingpost

Indicative – the method is chosen by the designer from ground conditions, depth, neighbours and programme.

Bottom-up, semi top-down and top-down construction
AspectBottom-up with struttingSemi top-downTop-down
SequenceExcavate to formation with temporary struts, then build the basement upwardsSome slabs cast top-down, others bottom-upGround slab first; basement slabs cast as excavation proceeds
Role of the kingpostSupports temporary struts; removed or cut after useSupports struts and selected slabsCarries slabs (and early tower floors); becomes a permanent column
Wall supportSteel struts and walersStruts and slabsPermanent slabs act as struts
Ground movement controlGood with preloaded strutsGoodVery good – stiff slabs at every level
ProgrammeBasement before towerPartly parallelBasement and tower in parallel
Steel supplied by World SteelKingposts, struts, walers, corner bracesKingposts, plunge columns, strutsPlunge columns with studs, splices and slab connections

العملية

How we deliver a kingpost package

  1. 1

    Drawings & method review

    Design drawings, specification and the piling contractor's installation method reviewed.

  2. 2

    Shop drawings & model

    Tekla model, shop drawings and splice plan submitted for approval.

  3. 3

    Material procurement

    Plates and sections ordered with 3.1 certificates to the approved schedule.

  4. 4

    Fabrication & NDT

    Built-up sections, splices, studs and details; UT and dimensional checks.

  5. 5

    Marking & batching

    Members marked with orientation, levels and sequence; batches matched to the pile programme.

  6. 6

    Delivery & records

    Delivered within site windows; records handed over per batch.

FAQ

الأسئلة المتكررة

What is a kingpost in basement construction?

A steel column installed into a bored pile before excavation. It supports temporary struts in a strutted excavation, or carries the floor slabs in top-down construction, and is often encased in concrete to become a permanent column.

What is the difference between a kingpost and a plunge column?

Both are installed into piles before excavation. The term plunge column is usually used when the steel column becomes part of the permanent structure in top-down construction; kingpost is used both for temporary strut supports and for permanent plunge columns.

Does World Steel design the basement shoring system?

No. The retaining system, kingposts and struts are designed by the project's structural or geotechnical engineer, and installation is carried out by the piling and excavation contractors. We prepare shop drawings and fabricate, test and deliver the steel to that design.

How long can kingposts be?

Length follows the basement depth and the embedment into the pile. Long kingposts are fabricated in segments with full-penetration welded or bolted splices at positions approved by the engineer, and delivered within transport limits.

Which kingpost projects has World Steel completed?

World Steel fabricated and supplied the kingpost packages for The Sun Tower and Southgate Tower in Ho Chi Minh City, both completed in 2020.

Can you deliver to inner-city sites with restricted hours?

Yes. Kingposts are fabricated in batches matched to the piling programme and delivered in sequence within the site's delivery windows.

Planning a deep basement or top-down tower?

Send us the kingpost and shoring drawings, the specification and the piling programme – we return shop drawings, a fabrication schedule and a delivery plan that keeps your rig working.