نبني الثقة ونضمن النجاح بوابة العملاء dang.victor@worldsteelgroup.com +84 902 881 833
World SteelBuilding trust, Assuring success

Pre-Engineered Steel Buildings

Secondary Members – Purlins, Girts & Struts

Cold-formed C and Z members that support roof and wall cladding.

Secondary Members – Purlins, Girts & Struts

Cold-formed C, Z and U purlins and girts, struts and girder beams that carry the cladding and tie the frames together.

Secondary members transfer cladding loads to the primary frames and tie the frames together. Purlins and girts are cold-formed C, Z or U sections; struts and girder beams complete the system. Purlin spacing is typically 1.0–1.4 m depending on frame spacing and building loads.

الميزات والمكونات

  • C, Z and U cold-formed purlins and girts
  • Struts and girder beams
  • Typical purlin spacing 1.0 – 1.4 m
  • Bracing cables to locate and link the rafter frames

المشروع القادم

هل تخططون لمنشأة فولاذية في الخارج؟

أرسلوا إلينا مخططاتكم أو نموذج IFC – يرد فريق التسعير لدينا بنطاق التصنيع والجدول الزمني والسعر شاملاً التسليم.