신뢰 구축, 성공 보장 고객 포털 dang.victor@worldsteelgroup.com +84 902 881 833
World SteelBuilding trust, Assuring success

Pre-Engineered Steel Buildings

Secondary Members – Purlins, Girts & Struts

Cold-formed C and Z members that support roof and wall cladding.

Secondary Members – Purlins, Girts & Struts

Cold-formed C, Z and U purlins and girts, struts and girder beams that carry the cladding and tie the frames together.

Secondary members transfer cladding loads to the primary frames and tie the frames together. Purlins and girts are cold-formed C, Z or U sections; struts and girder beams complete the system. Purlin spacing is typically 1.0–1.4 m depending on frame spacing and building loads.

특징 및 구성 요소

  • C, Z and U cold-formed purlins and girts
  • Struts and girder beams
  • Typical purlin spacing 1.0 – 1.4 m
  • Bracing cables to locate and link the rafter frames

다음 프로젝트

해외 철골 구조물을 계획 중이십니까?

도면 또는 IFC 모델을 보내주십시오. 견적팀이 제작 범위, 일정 및 인도 가격을 회신해 드립니다.