Building trust, Assuring Success Client portal dang.victor@worldsteelgroup.com +84 902 881 833
World SteelBuilding trust, Assuring success

Pre-Engineered Steel Buildings

Secondary Members – Purlins, Girts & Struts

Cold-formed C and Z members that support roof and wall cladding.

Secondary Members – Purlins, Girts & Struts

Cold-formed C, Z and U purlins and girts, struts and girder beams that carry the cladding and tie the frames together.

Secondary members transfer cladding loads to the primary frames and tie the frames together. Purlins and girts are cold-formed C, Z or U sections; struts and girder beams complete the system. Purlin spacing is typically 1.0–1.4 m depending on frame spacing and building loads.

Features & components

  • C, Z and U cold-formed purlins and girts
  • Struts and girder beams
  • Typical purlin spacing 1.0 – 1.4 m
  • Bracing cables to locate and link the rafter frames

Next project

Planning a steel structure abroad?

Send us your drawings or IFC model – our estimating team replies with fabrication scope, schedule and delivered price.