Featured Guyana
Pre-Engineered Steel Buildings
The main frames that carry the building.

H-section and round columns, rafters or trusses, and the roof, purlin and gable bracing that stabilise the building.
The primary frame carries all loads to the foundations. Columns are most commonly welded H-sections, with round columns for special buildings. Rafters – built-up beams or trusses – typically span 30–50 m in factory buildings. Roof bracing, purlin bracing and gable bracing keep the structure stable during erection and in service.
Next project
Send us your drawings or IFC model – our estimating team replies with fabrication scope, schedule and delivered price.