Building trust, Assuring Success Client portal dang.victor@worldsteelgroup.com +84 902 881 833
World SteelBuilding trust, Assuring success

Structural steel export market

Cambodia

Next door to our plant – fast, road-delivered steel buildings.

High potential FTA with Vietnam: ATIGARCEP

Flag of Cambodia
GDP 2026
$52.4 billion
World rank
#101
Population
17.8 million
GDP per capita
$2,940
Main ports
1

Steel structures for Cambodia

Cambodia's special economic zones and manufacturing relocation drive demand for factories and warehouses, delivered by road from World Steel's plant in Tay Ninh.

Economy & key sectors

Garments, agriculture, tourism, construction

Demand for steel structures

SEZ factories, warehouses, logistics.

Free trade agreements

Agreements in force between Vietnam and Cambodia, and the country's wider trade network.

FTA with Vietnam

ATIGA ASEAN Trade in Goods Agreement Regional (ASEAN) · in force since 2010 Near-zero tariffs on most goods traded between ASEAN members.
RCEP Regional Comprehensive Economic Partnership Regional · in force since 2022 ASEAN + Japan, Korea, Australia, New Zealand, China.

Other trade agreements of Cambodia

Import regulations for steel structures

What to check when importing fabricated structural steel (HS 7308) or prefabricated buildings (HS 9406) into Cambodia.

  • ATIGA near-zero duty with Form D.
  • Design to the investor's chosen code.

Landed cost calculator

What does steel from Vietnam cost delivered to Cambodia?

Estimate freight, insurance, duty, taxes and local charges for fabricated steel structures – with the duty and tax rates for Cambodia already filled in.

Calculate landed cost
Import duty (HS 7308.90)
MFN 7% · ATIGA / RCEP 0%
VAT
10%
Customs value basis
CIF

Tariffs and trade measures change frequently. This information is a general guide, not legal or customs advice – World Steel confirms the current duty and documentation position with every quotation.

Holidays & cultural calendar

Upcoming holidays and cultural events in Cambodia

Plan RFQs, approvals and deliveries around the days when offices, customs and ports close. Weekend: Sat–Sun (many private firms work Saturday morning).

Full calendar 2026–2027 →

Business seasonality: Activity stops for Khmer New Year (mid-April), Pchum Ben (Sept/Oct) and the Water Festival (November), when workers travel home; plan shipments and site work around these three-day breaks.

Seaports & logistics

Main container gateways for shipments from Ho Chi Minh City / Cai Mep to Cambodia. Steel is shipped in containers, flat racks or break-bulk depending on member size.

All world ports →

Provinces (25)

  • Baat Dambang
  • Banteay Mean Choăy
  • Kaeb
  • Kampong Chaam
  • Kampong Chhnang
  • Kampong Spueu
  • Kampong Thum
  • Kampot
  • Kandaal
  • Kaoh Kong
  • Kracheh
  • Mondol Kiri
  • Otdar Mean Chey
  • Pailin
  • Phnom Penh
  • Pousaat
  • Preah Sihanouk
  • Preah Vihear
  • Prey Veaeng
  • Rotanak Kiri
  • Siem Reab
  • Stueng Traeng
  • Svaay Rieng
  • Taakaev
  • Tbong Khmum

Next project

Planning a steel structure abroad?

Send us your drawings or IFC model – our estimating team replies with fabrication scope, schedule and delivered price.