Building trust, Assuring Success Client portal dang.victor@worldsteelgroup.com +84 902 881 833
World SteelBuilding trust, Assuring success

WS overhead cranes, gantries & hoists

WS jib cranes

WS pillar and wall-mounted jib cranes with electric hoists – slewing lifting for workstations, machines and quays, from light loads to heavy outdoor jibs.

United StatesAustralia / NZEurope

Request a quotation Specifications

  • Pillar or wall-mounted
  • Manual or powered slewing
  • Wire rope or chain hoist
  • Workstations, machines, quays

What it is

A jib crane lifts with a hoist running on a horizontal arm that slews around a pillar or a wall bracket. It serves a circle around a machine, a workstation or a loading point without tying up the main overhead crane – and heavy outdoor jibs on quays can load boats and trucks.

Duty group

FEM and ISO duty groups for cranes and hoists
Duty groups – FEM 9.511 and ISO 4301.

Vietnam: cranes are designed, manufactured and inspected to TCVN 4244:2005 and the lifting-equipment safety regulation QCVN 07:2012/BLĐTBXH, with technical inspection before use.

Standards and requirements by market

Codes World Steel designs, fabricates and documents this product to – and the key geometric and load requirements in each market.

United States

  • CMAA 70 / CMAA 74Top-running and single girder crane specifications
  • ASME B30.2 · B30.17Overhead and gantry cranes – safety
  • ASME B30.16 · ASME HST-4Overhead hoists
  • OSHA 1910.179Overhead and gantry cranes
Load test
125 % of rated load (ASME B30.2)
All United States standards →

Australia / NZ

  • AS 1418.1Cranes – general requirements
  • AS 1418.18Crane runways and monorails
  • AS 2550.1Cranes – safe use
  • AS 4100 · AS/NZS 1554.1Steel design and welding
Registration
Design and item registration per state WHS rules
All Australia & New Zealand standards →

Europe

  • EN 15011Bridge and gantry cranes
  • EN 14492-2Power-driven hoists
  • EN 13001 seriesCrane design – general, actions, limit states
  • Machinery DirectiveCE marking of the complete crane
Load test
Static 125 % and dynamic 110 % per EN 15011 / EN 14492-2
All Europe standards →

Summary for orientation only – the project specification, the adopted code edition and the authority having jurisdiction govern.

Finishes

FinishStandards / notes
PaintBlast cleaned, epoxy primer + polyurethane topcoat in safety yellow or project colour
MarkingRated capacity and safety slogans on the girder in the client's language
EnvironmentTropical, cold, high-temperature or chemical execution for hoists

Frequently asked questions

Does a jib crane need a special foundation?

Pillar jibs need a foundation designed for the overturning moment; wall jibs need a column or wall checked for the reactions.

Next project

Planning a steel structure abroad?

Send us your drawings or IFC model – our estimating team replies with fabrication scope, schedule and delivered price.