- Pillar or wall-mounted
- Manual or powered slewing
- Wire rope or chain hoist
- Workstations, machines, quays
What it is
A jib crane lifts with a hoist running on a horizontal arm that slews around a pillar or a wall bracket. It serves a circle around a machine, a workstation or a loading point without tying up the main overhead crane – and heavy outdoor jibs on quays can load boats and trucks.
Duty group
Vietnam: cranes are designed, manufactured and inspected to TCVN 4244:2005 and the lifting-equipment safety regulation QCVN 07:2012/BLĐTBXH, with technical inspection before use.
시장별 표준 및 요구사항
World Steel이 본 제품의 설계, 제작, 문서화에 적용하는 기준 – 그리고 각 시장의 주요 형상 및 하중 요구사항.
미국
- CMAA 70 / CMAA 74Top-running and single girder crane specifications
- ASME B30.2 · B30.17Overhead and gantry cranes – safety
- ASME B30.16 · ASME HST-4Overhead hoists
- OSHA 1910.179Overhead and gantry cranes
- Load test
- 125 % of rated load (ASME B30.2)
호주 / 뉴질랜드
- AS 1418.1Cranes – general requirements
- AS 1418.18Crane runways and monorails
- AS 2550.1Cranes – safe use
- AS 4100 · AS/NZS 1554.1Steel design and welding
- Registration
- Design and item registration per state WHS rules
유럽
- EN 15011Bridge and gantry cranes
- EN 14492-2Power-driven hoists
- EN 13001 seriesCrane design – general, actions, limit states
- Machinery DirectiveCE marking of the complete crane
- Load test
- Static 125 % and dynamic 110 % per EN 15011 / EN 14492-2
참고용 요약입니다 – 프로젝트 시방서, 채택된 기준 판본 및 관할 기관의 요구가 우선합니다.
표면 처리
| 표면 처리 | 표준 / 비고 |
|---|---|
| Paint | Blast cleaned, epoxy primer + polyurethane topcoat in safety yellow or project colour |
| Marking | Rated capacity and safety slogans on the girder in the client's language |
| Environment | Tropical, cold, high-temperature or chemical execution for hoists |
자주 묻는 질문
Does a jib crane need a special foundation?
Pillar jibs need a foundation designed for the overturning moment; wall jibs need a column or wall checked for the reactions.









