신뢰 구축, 성공 보장 고객 포털 dang.victor@worldsteelgroup.com +84 902 881 833
World SteelBuilding trust, Assuring success

WS overhead cranes, gantries & hoists

WS double girder overhead crane

WS double girder overhead cranes with box girders, top-running trolley hoist and maintenance walkway – for heavy loads, long spans and maximum hook height.

미국호주 / 뉴질랜드유럽

견적 요청 사양

  • Two box or I girders with rail-mounted trolley
  • Capacities to 50 t and above
  • Maximum hook height under the girders
  • Maintenance walkway and handrail
  • Open-winch trolleys for heavy duty

What it is

A double girder crane has two main girders with a rail on top of each; the hoist trolley runs between them. The hook can rise between the girders, giving maximum lifting height, and the girders carry heavy loads over long spans. A maintenance walkway with handrail gives safe access to the trolley, conductors and drives.

For the heaviest duties World Steel builds open-winch trolleys – drum, gearbox, motor and brakes on a welded frame – in our own workshop.

Structure

Main parts of an overhead crane
Main parts of an overhead crane: runway, rails, end carriages, girders, hoist, conductors and controls.
  • Runway beam – Hot-rolled or built-up steel section
  • Crane rail – Railway rail, square bar or flat rail
  • End carriage – Channel or box section with buffers at both ends
  • Main girder – Single or double; box, I or box + I by span and capacity
  • Hoist – Electric wire rope hoist – lift, lower, cross travel
  • Cross travel rail – On the girder top (double girder)
  • Cross conductor – Festoon cable or conductor rail
  • Long travel conductor – Enclosed safety conductor rail

Duty group

FEM and ISO duty groups for cranes and hoists
Duty groups – FEM 9.511 and ISO 4301.

Vietnam: cranes are designed, manufactured and inspected to TCVN 4244:2005 and the lifting-equipment safety regulation QCVN 07:2012/BLĐTBXH, with technical inspection before use.

시장별 표준 및 요구사항

World Steel이 본 제품의 설계, 제작, 문서화에 적용하는 기준 – 그리고 각 시장의 주요 형상 및 하중 요구사항.

미국

  • CMAA 70 / CMAA 74Top-running and single girder crane specifications
  • ASME B30.2 · B30.17Overhead and gantry cranes – safety
  • ASME B30.16 · ASME HST-4Overhead hoists
  • OSHA 1910.179Overhead and gantry cranes
Load test
125 % of rated load (ASME B30.2)
United States 표준 전체 →

호주 / 뉴질랜드

  • AS 1418.1Cranes – general requirements
  • AS 1418.18Crane runways and monorails
  • AS 2550.1Cranes – safe use
  • AS 4100 · AS/NZS 1554.1Steel design and welding
Registration
Design and item registration per state WHS rules
Australia & New Zealand 표준 전체 →

유럽

  • EN 15011Bridge and gantry cranes
  • EN 14492-2Power-driven hoists
  • EN 13001 seriesCrane design – general, actions, limit states
  • Machinery DirectiveCE marking of the complete crane
Load test
Static 125 % and dynamic 110 % per EN 15011 / EN 14492-2
Europe 표준 전체 →

참고용 요약입니다 – 프로젝트 시방서, 채택된 기준 판본 및 관할 기관의 요구가 우선합니다.

표면 처리

표면 처리표준 / 비고
PaintBlast cleaned, epoxy primer + polyurethane topcoat in safety yellow or project colour
MarkingRated capacity and safety slogans on the girder in the client's language
EnvironmentTropical, cold, high-temperature or chemical execution for hoists

자주 묻는 질문

Why choose a double girder crane?

For heavy loads, long spans, high duty and maximum hook height – and when a walkway is needed for maintenance.

다음 프로젝트

해외 철골 구조물을 계획 중이십니까?

도면 또는 IFC 모델을 보내주십시오. 견적팀이 제작 범위, 일정 및 인도 가격을 회신해 드립니다.