建立信任,确保成功 客户门户 dang.victor@worldsteelgroup.com +84 902 881 833
World SteelBuilding trust, Assuring success

WS overhead cranes, gantries & hoists

WS double girder overhead crane

WS double girder overhead cranes with box girders, top-running trolley hoist and maintenance walkway – for heavy loads, long spans and maximum hook height.

美国澳大利亚 / 新西兰欧洲

索取报价 技术规格

  • Two box or I girders with rail-mounted trolley
  • Capacities to 50 t and above
  • Maximum hook height under the girders
  • Maintenance walkway and handrail
  • Open-winch trolleys for heavy duty

What it is

A double girder crane has two main girders with a rail on top of each; the hoist trolley runs between them. The hook can rise between the girders, giving maximum lifting height, and the girders carry heavy loads over long spans. A maintenance walkway with handrail gives safe access to the trolley, conductors and drives.

For the heaviest duties World Steel builds open-winch trolleys – drum, gearbox, motor and brakes on a welded frame – in our own workshop.

Structure

Main parts of an overhead crane
Main parts of an overhead crane: runway, rails, end carriages, girders, hoist, conductors and controls.
  • Runway beam – Hot-rolled or built-up steel section
  • Crane rail – Railway rail, square bar or flat rail
  • End carriage – Channel or box section with buffers at both ends
  • Main girder – Single or double; box, I or box + I by span and capacity
  • Hoist – Electric wire rope hoist – lift, lower, cross travel
  • Cross travel rail – On the girder top (double girder)
  • Cross conductor – Festoon cable or conductor rail
  • Long travel conductor – Enclosed safety conductor rail

Duty group

FEM and ISO duty groups for cranes and hoists
Duty groups – FEM 9.511 and ISO 4301.

Vietnam: cranes are designed, manufactured and inspected to TCVN 4244:2005 and the lifting-equipment safety regulation QCVN 07:2012/BLĐTBXH, with technical inspection before use.

各市场标准与要求

World Steel 设计、加工本产品及编制文件所依据的规范——以及各市场的主要几何与荷载要求。

美国

  • CMAA 70 / CMAA 74Top-running and single girder crane specifications
  • ASME B30.2 · B30.17Overhead and gantry cranes – safety
  • ASME B30.16 · ASME HST-4Overhead hoists
  • OSHA 1910.179Overhead and gantry cranes
Load test
125 % of rated load (ASME B30.2)
全部United States标准 →

澳大利亚 / 新西兰

  • AS 1418.1Cranes – general requirements
  • AS 1418.18Crane runways and monorails
  • AS 2550.1Cranes – safe use
  • AS 4100 · AS/NZS 1554.1Steel design and welding
Registration
Design and item registration per state WHS rules
全部Australia & New Zealand标准 →

欧洲

  • EN 15011Bridge and gantry cranes
  • EN 14492-2Power-driven hoists
  • EN 13001 seriesCrane design – general, actions, limit states
  • Machinery DirectiveCE marking of the complete crane
Load test
Static 125 % and dynamic 110 % per EN 15011 / EN 14492-2
全部Europe标准 →

摘要仅供参考——以项目技术规格书、所采用的规范版本及主管机构要求为准。

表面处理

表面处理标准 / 备注
PaintBlast cleaned, epoxy primer + polyurethane topcoat in safety yellow or project colour
MarkingRated capacity and safety slogans on the girder in the client's language
EnvironmentTropical, cold, high-temperature or chemical execution for hoists

常见问题

Why choose a double girder crane?

For heavy loads, long spans, high duty and maximum hook height – and when a walkway is needed for maintenance.

下一个项目

计划在海外建造钢结构?

请发送您的图纸或 IFC 模型——我们的报价团队将回复加工范围、工期及到岸价格。