Featured United States
钢结构出口市场
The world's largest economy and the largest market for metal building systems.
高潜力
The United States combines the largest construction market in the world with a mature metal-building (PEMB) industry and strict code compliance – IBC, ASCE 7, AISC 360 and AWS D1.1. World Steel was the first company in Asia accredited under IAS AC472 for metal building systems.
Services, technology, manufacturing, energy, agriculture, logistics
Reshoring of manufacturing, data centres, warehouses and logistics, energy and industrial projects; strong demand for pre-engineered metal buildings.
由越南供应
钢结构、预制钢结构建筑及围护系统产品,均在我们经认证的越南工厂加工,发运即可安装。
越南与the United States之间现行有效的协定,以及该国更广泛的贸易网络。
越南与the United States之间没有自由贸易协定。进口货物按标准(MFN)税率征税——我们可应要求提供到岸成本报价。
向the United States进口加工钢结构(HS 7308)或预制建筑(HS 9406)时需核查的事项。
Section 232 of the Trade Expansion Act allows additional US duties on imports of steel articles and listed steel derivative products for national-security reasons. Since 2025 country exemptions have been removed, the duty rate has been raised and the list of derivative products expanded. Whether a fabricated steel structure (HTS 7308) or a prefabricated building (HTS 9406) is covered – and on what value – depends on the current proclamations and the exact HTS classification. We confirm the position with every quotation.
Since 2025 the US has also applied additional country-specific ("reciprocal") tariffs under emergency-economic-powers authority, including on imports from Vietnam, in parallel with Section 232. Rates, exclusions and their legal basis have changed repeatedly – always check the latest CBP guidance (CSMS messages) before pricing.
For steel products subject to Section 232, CBP requires the country where the steel was melted and poured to be reported at entry. World Steel supplies mill certificates showing melt and pour origin. Country of origin of the finished goods follows US "substantial transformation" rules; transhipment or misdeclared origin is penalised.
The US Department of Commerce and ITC maintain AD/CVD orders on many steel products by country. Before each shipment the exact HTS code and country of origin are checked against active AD/CVD orders and scope rulings.
Imports are cleared by a licensed US customs broker: Importer Security Filing (ISF "10+2") at least 24 hours before loading for ocean cargo, a continuous or single-entry customs bond, entry (CBP Form 3461) and entry summary (CBP Form 7501) with duty payment, plus marking of country of origin on goods or packaging (19 CFR Part 134).
Federally funded infrastructure projects are subject to Buy America and the Build America, Buy America Act (BABA), which require US-produced iron and steel. Privately funded commercial and industrial buildings are not affected.
Structures must comply with the International Building Code as adopted by the state / city, with loads to ASCE 7, steel design to AISC 360 / AISC 341, cold-formed design to AISI S100 and welding to AWS D1.1 / D1.3. Drawings are sealed by a licensed US professional engineer. Shop fabrication is subject to special inspection unless performed by an approved fabricator – IAS AC472 accreditation (held by World Steel) supports acceptance of metal building systems.
Typical commercial practice: AISC Code of Standard Practice (AISC 303) terms, imperial units and US detailing conventions, US-format submittals (shop drawings, calculations, erection drawings, anchor-bolt plans), ASTM material certificates, and Incoterms agreed up front (FOB Vietnam, CIF / DAP US port).
关税和贸易措施变化频繁。本信息仅为一般性指引,不构成法律或海关建议——World Steel 会在每份报价中确认现行关税及单证要求。
节假日与文化日历
围绕办公室、海关和港口关闭的日子安排询价、审批和交货。周末:Sat–Sun。
业务季节性: Business slows between Thanksgiving and New Year (especially 24 Dec–2 Jan) and around the July 4 and Labor Day long weekends; federal holidays falling on a weekend are observed on the nearest weekday.
下一个项目
请发送您的图纸或 IFC 模型——我们的报价团队将回复加工范围、工期及到岸价格。