Bâtir la confiance, garantir le succès Portail client dang.victor@worldsteelgroup.com +84 902 881 833
World SteelBuilding trust, Assuring success

WS overhead cranes, gantries & hoists

WS double girder overhead crane

WS double girder overhead cranes with box girders, top-running trolley hoist and maintenance walkway – for heavy loads, long spans and maximum hook height.

États-UnisAustralie / NZEurope

Demander un devis Caractéristiques

  • Two box or I girders with rail-mounted trolley
  • Capacities to 50 t and above
  • Maximum hook height under the girders
  • Maintenance walkway and handrail
  • Open-winch trolleys for heavy duty

What it is

A double girder crane has two main girders with a rail on top of each; the hoist trolley runs between them. The hook can rise between the girders, giving maximum lifting height, and the girders carry heavy loads over long spans. A maintenance walkway with handrail gives safe access to the trolley, conductors and drives.

For the heaviest duties World Steel builds open-winch trolleys – drum, gearbox, motor and brakes on a welded frame – in our own workshop.

Structure

Main parts of an overhead crane
Main parts of an overhead crane: runway, rails, end carriages, girders, hoist, conductors and controls.
  • Runway beam – Hot-rolled or built-up steel section
  • Crane rail – Railway rail, square bar or flat rail
  • End carriage – Channel or box section with buffers at both ends
  • Main girder – Single or double; box, I or box + I by span and capacity
  • Hoist – Electric wire rope hoist – lift, lower, cross travel
  • Cross travel rail – On the girder top (double girder)
  • Cross conductor – Festoon cable or conductor rail
  • Long travel conductor – Enclosed safety conductor rail

Duty group

FEM and ISO duty groups for cranes and hoists
Duty groups – FEM 9.511 and ISO 4301.

Vietnam: cranes are designed, manufactured and inspected to TCVN 4244:2005 and the lifting-equipment safety regulation QCVN 07:2012/BLĐTBXH, with technical inspection before use.

Normes et exigences par marché

Les codes selon lesquels World Steel conçoit, fabrique et documente ce produit – et les principales exigences géométriques et de charge sur chaque marché.

États-Unis

  • CMAA 70 / CMAA 74Top-running and single girder crane specifications
  • ASME B30.2 · B30.17Overhead and gantry cranes – safety
  • ASME B30.16 · ASME HST-4Overhead hoists
  • OSHA 1910.179Overhead and gantry cranes
Load test
125 % of rated load (ASME B30.2)
Toutes les normes United States →

Australie / NZ

  • AS 1418.1Cranes – general requirements
  • AS 1418.18Crane runways and monorails
  • AS 2550.1Cranes – safe use
  • AS 4100 · AS/NZS 1554.1Steel design and welding
Registration
Design and item registration per state WHS rules
Toutes les normes Australia & New Zealand →

Europe

  • EN 15011Bridge and gantry cranes
  • EN 14492-2Power-driven hoists
  • EN 13001 seriesCrane design – general, actions, limit states
  • Machinery DirectiveCE marking of the complete crane
Load test
Static 125 % and dynamic 110 % per EN 15011 / EN 14492-2
Toutes les normes Europe →

Synthèse fournie à titre indicatif – le cahier des charges du projet, l'édition du code adoptée et l'autorité compétente prévalent.

Finitions

FinitionNormes / remarques
PaintBlast cleaned, epoxy primer + polyurethane topcoat in safety yellow or project colour
MarkingRated capacity and safety slogans on the girder in the client's language
EnvironmentTropical, cold, high-temperature or chemical execution for hoists

Questions fréquentes

Why choose a double girder crane?

For heavy loads, long spans, high duty and maximum hook height – and when a walkway is needed for maintenance.

Prochain projet

Un projet de structure métallique à l'étranger ?

Envoyez-nous vos plans ou votre maquette IFC – notre équipe de chiffrage vous répond avec le périmètre de fabrication, le planning et le prix rendu chantier.