Design workflow · As-built drawings

As-built drawings – the final record of your structure

At handover we issue the as-built drawings: the structure as it was actually built, with every approved site change incorporated, together with the 3D model and the quality dossier – the reference for operation, maintenance, certification and future expansion.

Request a quotationDécouvrir la solution

Step 6
Of our design workflow
at handover
Final rev.
Site changes included
clouded and listed
Model
As-built 3D model
IFC on request
Dossier
With the quality records
see quality control
Sample as-built drawing with clouded change

Why as-built drawings matter

No project is built exactly as first drawn: anchor bolts are adjusted, openings move, details change after site queries. As-built drawings close the loop – every approved change is incorporated, clouded and listed in a final revision, so the drawings describe the structure that actually stands.

Owners use them for maintenance and inspection, for building certification and insurance, and as the starting point for every future modification or expansion.

Contents

The as-built package

Delivered at handover.

As-built drawingsfinal revision

As-built drawings

General arrangement, framing plans and sections with site changes incorporated.

Change registerRFIs · variations

Change register

List of site queries, changes and concessions and where they appear.

As-built 3D modelIFC

As-built 3D model

Model updated with the as-built changes, exported as IFC on request.

Anchor bolt surveyfoundations

Anchor bolt survey

Recorded positions where the survey differs from design.

Maintenance notesO&M

Maintenance notes

Coating system, bolt inspection and maintenance recommendations.

Applications

What the as-built record gives the owner

01

A true record

Drawings that match the structure, not the original intention.

02

Safe modifications

New openings, loads or extensions designed on reliable information.

03

Maintenance planning

Members, coatings and bolts identified for inspection and repair.

04

Certification

Documentation for authorities, insurers and future buyers.

05

Linked to quality records

Piece marks connect to certificates and inspection reports.

06

Ready for expansion

The next phase starts from accurate drawings and the model.

Design workflow · step 6 of 6

Where this fits in our design workflow

As-built drawings are step 6 – the last step of our design workflow. They start from the erection drawings (step 5) and the 3D model (step 3), updated with every approved site change.

Processus

The World Steel design workflow

  1. 1

    1 · Proposal drawings (PPD)

    Layout, sections and preliminary quantities issued with the quotation.

  2. 2

    2 · Approval

    Approval drawings, design report and column reactions – approved before fabrication.

  3. 3

    3 · 3D Tekla model

    Every member, plate, bolt and weld modelled and clash-checked.

  4. 4

    4 · Shop drawings

    Assembly and part drawings, CNC data and material lists.

  5. 5

    5 · Erection drawings

    Plans, sections, sequence and bolt lists for site.

  6. 6

    6 · As-built drawings

    Final record of the structure as built.

FAQ

Questions fréquentes

When are as-built drawings issued?

At handover, after erection is complete and site changes have been confirmed.

Who records the site changes?

Changes are recorded during erection through site queries, approvals and our supervisors' reports, and incorporated by our detailers.

Can we receive the as-built model?

Yes – an IFC export of the as-built model can be included in the handover package.

Plan for handover from day one

Tell us your handover requirements – drawings, model and dossier are planned with the project.