Bâtir la confiance, garantir le succès Portail client dang.victor@worldsteelgroup.com +84 902 881 833
World SteelBuilding trust, Assuring success

Certification World Steel

IAS AC472 accreditation for metal building systems

World Steel holds IAS AC472 accreditation MB-268 for the design and fabrication of metal building systems – IBC 1704.2.5.1 approved fabricator for US projects.

  • N° de certificatMB-268
  • Délivré parInternational Accreditation Service (IAS)
  • Valable jusqu'au1 Aug 2027

Voir le certificat Vérifier ↗

IAS AC472
Accreditation no. MB-268Part A fabrication + Part C designIBC 1704.2.5.1 approved fabricator programUnannounced inspections by Smith-Emery (AA-554)Valid up to 1 August 2027

Le certificat

Détails du certificat

Titulaire du certificat
World Steel Construction JSC
N° de certificat
MB-268
Norme
IAS AC472
Valable jusqu'au
1 Aug 2027
Program
Inspection Program for Manufacturer of Metal Building Systems
Accreditation criteria
AC472 – IAS Accreditation Criteria for Inspection Programs for Manufacturers of Metal Building Systems
Building code
In-plant inspection program in compliance with IBC Section 1704.2.5.1 (2015, 2018, 2021 and 2024 editions); Section 1704.2.5.2 of the 2012 IBC
Inspection agency
Smith-Emery Laboratories, Inc. (IAS accreditation AA-554) – periodic plant inspections
Certificate reference
IAS/MB-AC472/103-2

Check the current certificate on the IAS website ↗

Périmètre de certification

1

Part A – Fabrication

Fabrication of structural weldments and cold-formed products requiring welding.

Factory: Lot Q9-10-15-16, Street No. 7, Hai Son Industrial Park (Phase 3+4), Duc Hoa, Tay Ninh Province (formerly Long An Province), Vietnam

2

Part C – Design

Design of metal building systems.

Engineering office: 55 Le Thuc Hoach Street, Phu Tho Hoa Ward, Ho Chi Minh City, Vietnam

What IAS AC472 is

The International Accreditation Service (IAS) is a US accreditation body. Its criteria AC472 define how a manufacturer of metal building systems – the pre-engineered buildings that combine a primary rigid frame, cold-formed secondary members, roof and wall cladding and accessories – must control design, purchasing, fabrication, inspection and records so that a building official can rely on the plant's own quality system instead of sending a special inspector into the shop.

An accredited manufacturer is not simply audited once. IAS reviews the written quality manual and procedures, an IAS-accredited inspection agency carries out periodic, unannounced in-plant inspections, and IAS reassesses the programme on site. World Steel's in-plant inspections are performed by Smith-Emery Laboratories, Inc. (IAS inspection agency AA-554). The accreditation is renewed on a fixed cycle; the current certificate is valid up to 1 August 2027.

How the IAS AC472 programme works – IAS, inspection agency, manufacturer and building official
IAS accredits both the manufacturer's programme and the inspection agency that audits it; the building official relies on the accreditation under IBC 1704.2.5.1.

Why it matters on a US project

The International Building Code requires special inspection of structural steel fabrication (IBC Chapter 17). Section 1704.2.5.1 lets the building official waive special inspection of work done on the premises of an approved fabricator – a fabricator whose written procedures and quality control manuals have been reviewed and whose fabrication practices are audited periodically by an approved agency. AC472 accreditation is the recognised route to that approval for metal building manufacturers: World Steel's certificate states that the in-plant inspection programme complies with IBC Section 1704.2.5.1 of the 2015, 2018, 2021 and 2024 editions.

For owners and contractors this means fewer third-party shop inspections, less schedule risk and a supplier whose design calculations, drawings and fabrication are already under continuous independent surveillance. IAS AC472 accreditation is also required for membership of the Metal Building Manufacturers Association (MBMA), so it is the quality benchmark US specifiers expect from a metal building supplier. Read more in US standards and US PEB standards.

The AC472 accreditation covers metal building systems (Part A fabrication and Part C design). Other structural steel and miscellaneous metals for US projects are fabricated under the same quality system, AWS D1.1 welding and the project's special inspection requirements.

Scope of World Steel's accreditation

The certificate covers two parts of AC472 at two sites. Part A – Fabrication of structural weldments and cold-formed products requiring welding applies to the factory in Hai Son Industrial Park, where built-up tapered frames, hot-rolled members, cold-formed purlins and girts and welded accessories are produced. Part C – Design of metal building systems applies to the engineering office in Ho Chi Minh City, where buildings are designed and detailed to US codes – IBC loads per ASCE 7, steel design to AISC 360 and AISI S100, and welding to AWS D1.1.

IAS AC472 scope – World Steel MB-268
PartActivitySite
Part AFabrication of structural weldments and cold-formed products requiring weldingFactory – Hai Son Industrial Park, Duc Hoa, Tay Ninh
Part CDesign of metal building systemsEngineering office – Ho Chi Minh City

What is audited

The AC472 programme looks at every activity that determines the quality of a delivered building: contract and design review, engineering calculations and drawing control, purchasing and supplier control (including outsourced cold-formed products), receiving inspection and material traceability, welding procedures and welder qualifications, calibration of equipment, in-process and final inspection, non-conformance and corrective action, training, document control and quality records. World Steel reports being the first company in Asia to achieve IAS AC472 accreditation, and the programme has been maintained through repeated re-accreditation cycles.

  • Design: load criteria, calculation checking, drawing approval and revision control.
  • Materials: mill test reports, heat-number traceability from plate to finished member.
  • Welding: AWS D1.1 procedures, qualified welders and inspectors, visual and NDT inspection.
  • Coatings and packing: surface preparation, paint inspection, marking and shipping records.

Ce que cela signifie pour votre projet

Shop special inspection can be waived

IBC 1704.2.5.1 allows the building official to accept the accredited in-plant programme instead of special inspection of shop fabrication.

Independent, unannounced surveillance

Smith-Emery Laboratories inspects the plant periodically without notice; IAS reassesses the programme.

Design and fabrication under one system

Part C (design) and Part A (fabrication) are both accredited – calculations, drawings and steel are controlled together.

Recognised by US specifiers

AC472 is the benchmark for metal building manufacturers and a requirement for MBMA membership.

Obtention et maintien de la certification

  1. 1

    Quality manual review

    IAS reviews the written quality manual and procedures against AC472.

  2. 2

    Initial assessment

    IAS assessors verify design and fabrication practice at the office and plant.

  3. 3

    Unannounced inspections

    The accredited inspection agency audits production periodically and reports to IAS.

  4. 4

    Reassessment and renewal

    IAS reassesses the programme and reissues the certificate on its renewal cycle.

Questions fréquentes

Does IAS AC472 accreditation remove the need for special inspection?

It allows it. Under IBC Section 1704.2.5.1 the building official may waive special inspection of fabrication carried out on the premises of an approved fabricator. Field work such as bolting and welding on site remains subject to the project's special inspection requirements.

Which inspection agency audits World Steel?

Periodic plant inspections are conducted by Smith-Emery Laboratories, Inc., an IAS-accredited inspection agency (AA-554), to monitor compliance with AC472.

How can I verify the accreditation?

The certificate states the program number MB-268 and is published by IAS. Use the verification link on this page or the IAS directory at iasonline.org for current accreditation information.

Does AC472 cover structural steel that is not a metal building?

AC472 is specific to metal building systems. Other structural steel and miscellaneous metals are fabricated under the same quality system with AWS D1.1 welding, and special inspection is arranged according to the project requirements.

Which sites are covered?

Part A (fabrication) covers the factory in Hai Son Industrial Park, Duc Hoa, Tay Ninh Province; Part C (design) covers the engineering office in Ho Chi Minh City.

Prochain projet

Un projet de structure métallique à l'étranger ?

Envoyez-nous vos plans ou votre maquette IFC – notre équipe de chiffrage vous répond avec le périmètre de fabrication, le planning et le prix rendu chantier.