신뢰 구축, 성공 보장 고객 포털 dang.victor@worldsteelgroup.com +84 902 881 833
World SteelBuilding trust, Assuring success
Steel production hall with two double girder overhead cranes on runway beams

Solution · WS cranes & hoists

Cranes built with the building that carries them

Single and double girder overhead cranes, gantry and semi-gantry cranes, jib cranes, monorails and electric wire rope hoists from 1 to 50 t – girders, end carriages and runway beams fabricated in our certified steel plant and delivered with the steel building.

Request a crane quote솔루션 살펴보기

1 – 50 t +
Hoist and crane capacity
FEM 1Am – 3m
ISO M4 – M6 hoists
heavier duty on request
7 – 80 m
Hook travel
1 package
Crane + runway + building
Double girder overhead crane

One supplier for the crane and the steel

A crane is only as good as the runway and the building that carry it. World Steel designs the crane, its wheel loads, the runway beams, brackets and the steel frame together – so deflections, clearances and fatigue are checked once, and the crane fits the building on the first lift.

Girders, end carriages, trolleys and runway beams are fabricated in our structural steel plant; hoists, drives and electrics are assembled and function-tested before shipment, then installed, load-tested and handed over with training and a maintenance plan.

WS crane range

Cranes, hoists and parts

Every product has its own page with types, tables and standards.

In operation

Cranes at work

Typical WS crane types in production halls, yards and plants.

Production hallsdouble girder

Production halls

Two cranes sharing one runway in a long-span fabrication hall.

Outdoor yardsgantry

Outdoor yards

Gantry cranes over precast, pipe and steel stock yards.

Workshopssingle girder

Workshops

Several single girder cranes of different capacities in one workshop.

Plants & hydropowerspecial gantries

Plants & hydropower

Intake gantries and maintenance cranes for power and process plants.

Cranes at work

적용 분야

Where WS cranes lift

01

Steel & fabrication

Plate, sections and assemblies in fabrication and service centres.

02

Precast & construction materials

Moulds, piles, beams and pipes in yards and halls.

03

Manufacturing & assembly

Machines, dies and products along production lines.

04

Warehouses & logistics

Coils, bundles and heavy goods in stores.

05

Power, water & hydro

Turbine halls, pump stations and intake gates.

06

Ports & shipyards

Quay jibs, gantries and transfer carts.

기준 및 규정 준수

Crane codes by market

Cranes are designed, tested and documented to the code of the project location. Key references:

Vietnam & Asia

  • TCVN 4244:2005Lifting equipment – design, manufacture, inspection
  • QCVN 07:2012/BLĐTBXHSafety regulation for lifting equipment
  • FEM 9.511 · ISO 4301Duty groups of hoists and cranes

United States

  • CMAA 70 / CMAA 74Top-running and single girder cranes
  • ASME B30.2 · B30.17Overhead and gantry cranes
  • ASME B30.16 · HST-4Hoists
  • OSHA 1910.179Overhead and gantry cranes
United States 표준 전체 →

Australia / NZ

  • AS 1418.1 · AS 1418.18Cranes – general; runways and monorails
  • AS 2550Cranes – safe use
  • AS/NZS 5131 WSC 인증 보유Fabrication – World Steel certified CC3
Australia & New Zealand 표준 전체 →

Europe

  • EN 15011Bridge and gantry cranes
  • EN 14492-2Power-driven hoists
  • EN 13001Crane design
  • EN 1090-2 WSC 인증 보유Runway steel – World Steel EXC3 · CE
Europe 표준 전체 →
Crane codes by market

참고용 요약입니다 – 프로젝트 시방서, 채택된 기준 판본 및 관할 기관의 요구가 우선합니다.

엔지니어링

Every part has a job

Runway beams and rails, end carriages with buffers, the main girders, the hoist and trolley, conductor rails for long and cross travel, the control panel and pendant or radio – each part is selected for the capacity, span and duty of your crane.

On double girder cranes a walkway with handrail gives safe access for maintenance of the trolley, conductors and drives.

Main parts of an overhead crane
FEM and ISO duty groups

엔지니어링

Duty first, then capacity

A crane lifting 10 t twice a day and one lifting 10 t every few minutes are different machines. We select hoist, wheels, drives and girders for the duty group – FEM 1Am to 3m, ISO M4 to M6 for standard hoists, heavier groups on request – or the CMAA and AS 1418 classes of your project.

엔지니어링

Hoists you can specify line by line

WS wire rope hoists cover 1 to 50 t with 2/1 and 4/1 reeving, two speeds or inverter control, hook travel up to 80 m and versions for normal headroom, low headroom, double-rail trolleys and fixed mounting. One code describes capacity, frame, hook travel, speed, reeving, mounting, electrics, trolley speed and climate.

See the full table on the wire rope hoists page.

WS hoist type code
Crane delivery process

엔지니어링

From girder to load test

Built-up box girders are welded and inspected in the same plant as our structural steel – see built-up members – then fitted with end carriages, trolley, hoist and electrics and function-tested before shipping.

On site we check the runway, erect and align the crane and carry out static and dynamic load tests with the inspection authority before handover.

사양

Specification & options

Crane type
Single / double girder overhead, gantry, semi-gantry, jib, monorail, transfer cart
Hoist
Wire rope hoist 1–50 t, chain hoist, open-winch trolley for heavy duty
Speeds & control
Two-speed or inverter; pendant, radio remote or cabin
Safety
Load limiter, limit switches, anti-collision sensors, emergency stop, warning lights
Power supply
Enclosed conductor rail, festoon or cable reel
Environment
Outdoor IP65, cold, high-temperature, tropical or chemical execution
Runway & building
Runway beams, rails, brackets and the steel building from World Steel

프로세스

How we deliver a crane

  1. 1

    Requirements

    Capacity, span, lift, duty and building.

  2. 2

    Engineering

    Crane, wheel loads and runway together.

  3. 3

    Fabrication

    Girders, end carriages and trolleys in our plant.

  4. 4

    Assembly & test

    Hoist, drives, electrics, function test.

  5. 5

    Installation

    Runway check, erection and alignment.

  6. 6

    Load test & care

    Load test, training, maintenance plan.

FAQ

자주 묻는 질문

Single or double girder – which do I need?

Single girder cranes are economical up to about 20 t and moderate spans. Double girder cranes suit heavier loads, longer spans, higher duty and maximum hook height, and give a walkway for maintenance.

Can you supply the crane together with the building?

Yes – that is our strength. World Steel designs the crane, runway beams and steel building together, so wheel loads, deflections and clearances are coordinated from the start.

Which standards do you design to?

TCVN 4244 and QCVN 07 in Vietnam, CMAA and ASME B30 in the US, AS 1418 in Australia and EN 15011 / EN 14492-2 in Europe, with the duty group of FEM 9.511 or ISO 4301.

Are the cranes load-tested?

Every crane is function-tested in the factory and load-tested on site – static and dynamic tests to the applicable code – with the inspection authority where required.

Do you provide maintenance and spare parts?

Yes – inspection, maintenance, repair, upgrades such as inverters or radio control, and spare parts including panels, pendants, motors, conductor rails and wheels.

인도 조건 · Incoterms® 2020

필요한 조건으로 인도합니다

World Steel은 공장 인도, 본선 인도 또는 귀사의 항구나 현장 인도 가격으로 견적합니다. 수출 포장, 서류 및 호찌민시 선적은 서비스에 포함됩니다.

Incoterms® 2020 전체 비교 →

Lifting something heavy?

Send capacity, span, lift and your building – we return the crane selection, runway loads and a delivered, installed price.

Request a crane quote +84 902 881 833