Steel truss pedestrian bridge over a four-lane road with stair towers

Solution · Steel pedestrian bridges

Pedestrian bridges, engineered in steel

Footbridges, skywalks and landmark crossings – designed for comfort, fabricated under EN 1090 EXC3 and AS/NZS 5131 CC3 certification, delivered in modules and lifted into place in a single night, to US, Australian, European and Vietnamese codes.

Discuss your bridgeExplore the solution

10–60 m
Typical single spans
1.5–6 m
Clear deck widths
4
Code systems
US · AU · EU · VN
EXC3 · CC3
Certified fabrication
Steel arch pedestrian bridge

A crossing people enjoy using

A pedestrian bridge is judged by the people who walk over it every day: it must feel solid underfoot, be easy to reach by stair, ramp or lift, stay comfortable in wind and crowds, and look right in its setting for decades. Behind that experience sits serious engineering – dynamic behaviour, fatigue, corrosion protection and an erection plan that closes a road for hours, not weeks.

World Steel designs, details, fabricates and delivers steel footbridges as complete, tested modules. Our engineers work with your designer or deliver the full design-and-build package, our certified factory in Vietnam fabricates and coats every member, and the bridge ships with a full quality dossier to the codes of your market.

Structural forms

Bridge typologies

One fabrication system, every structural form – chosen for span, site, budget and the image of the crossing.

Truss footbridgesabout 20–60 m

Truss footbridges

Warren or Pratt trusses, through or half-through, with steel or composite decks. Light, stiff and modular – the most efficient form for road and rail crossings.

Covered skywalksabout 15–50 m

Covered skywalks

Enclosed box trusses with roof, glazing, lighting and ventilation, linking hospitals, campuses, stations, malls and office towers.

Arch & bowstring bridgesabout 30–80 m

Arch & bowstring bridges

Tied arches with slender hangers – a landmark silhouette over rivers, parks and waterfronts, with no thrust on the foundations.

Girder footbridgesabout 10–35 m

Girder footbridges

Plate or box girders with a clean underside for creeks, park paths and short road spans – economical, robust and quick to install.

Bridge typologies

Applications

Where our footbridges go

01

Urban road crossings

Over highways and arterial roads, with stair, ramp and lift towers.

02

Rail & transit stations

Platform links and concourse bridges with protective screens.

03

Hospitals & campuses

Weather-protected skywalks between buildings.

04

Parks & waterways

Arches and girders over rivers, lakes and creeks.

05

Industrial plants

Access bridges over pipe racks, roads and conveyors.

06

Resorts & commercial

Landmark crossings, mall links and leisure routes.

Codes & compliance

Designed to the codes of your market

Every bridge is designed, fabricated and documented to the standards of its destination. Key references:

United States

  • AASHTO LRFD BDSAASHTO LRFD Bridge Design Specifications
  • AASHTO Ped. Guide SpecLRFD Guide Specifications for the Design of Pedestrian Bridges
  • AWS D1.5Bridge Welding Code
  • ASTM A709Structural steel for bridges
  • ADA StandardsAccessible routes, ramps and handrails
Pedestrian live load
90 psf (4.3 kPa) – AASHTO pedestrian guide specification
Vibration
Vertical frequency ≥ 3.0 Hz and lateral ≥ 1.3 Hz, or check by the weight criterion
Railing height
42 in (1,070 mm) minimum pedestrian railing – AASHTO LRFD
Note
Federally funded projects fall under Buy America (domestic steel) – confirm funding at tender
All United States standards →

Australia / NZ

  • AS 5100Bridge design (Parts 1–8)
  • AS 5100.2Design loads – pedestrian and cyclist loading, dynamics
  • AS 5100.6Steel and composite construction
  • AS/NZS 5131 WSC certifiedStructural steelwork – fabrication and erection
  • AS/NZS 1554.1 / .5Welding of steel structures (incl. fatigue loading)
  • AS 1428.1Design for access and mobility
Fabrication
Construction Category set by the designer – World Steel certified CC3
Ramps
Gradient not steeper than 1:14 for accessible ramps – AS 1428.1
Barriers
Height and infill per AS 5100.1 and the road authority
All Australia & New Zealand standards →

Europe

  • EN 1991-2Traffic loads on bridges – footbridges
  • EN 1990 Annex A2Comfort criteria for footbridges
  • EN 1993-2Design of steel bridges
  • EN 1090-2 WSC certifiedExecution of steel structures (EXC3 typical for bridges)
  • EN ISO 12944Corrosion protection by paint systems
Crowd load
qfk = 2.0 + 120/(L + 30) kN/m², between 2.5 and 5.0 kN/m² (recommended values)
Comfort
Check if vertical f < 5 Hz or lateral f < 2.5 Hz; vertical acceleration 0.7 m/s² (recommended)
Conformity
CE marking under EN 1090-1 – World Steel FPC certificate 2797 CPR 827443
All Europe standards →

Vietnam

  • TCVN 11823:2017Highway bridge design (LRFD, series)
  • TCVN 5575Steel structures – design
  • TCVN 170:2007Steel structures – fabrication, assembly and acceptance
  • TCVN 8789:2011Protective paints for steel structures
  • TCVN 5408:2007Hot-dip galvanized coatings on iron and steel articles
  • QCVN 10:2014/BXDAccessibility for people with disabilities
Loads & design
Pedestrian loads and dynamics per TCVN 11823 and the owner's design brief
Clearance
Vertical clearance over roads per the road authority and road class
Approvals
Design appraisal and acceptance per Vietnamese construction regulations
Designed to the codes of your market

Summary for orientation only – the project specification, the adopted code edition and the authority having jurisdiction govern.

Engineering

Comfort is engineered, not assumed

Slender footbridges can resonate with walking. We analyse every bridge dynamically – natural frequencies, modal mass and pedestrian-induced accelerations – against AASHTO, EN 1990 Annex A2, AS 5100 or the owner's comfort class.

Where needed we tune stiffness and mass or integrate tuned mass dampers in the deck, so the bridge feels solid from the first day.

Footbridge vibration frequency ranges and code criteria
Pedestrian bridge delivery sequence from engineering to handover

Engineering

Modular, from factory to crossing

Bridges are fabricated in segments sized for 40-ft containers or flat racks, trial-assembled and match-marked in the factory, coated to C4–C5 protective systems and shipped with bolted splices.

On site the bridge is assembled on the ground, fitted out and lifted into place in a single crane operation – typically a night-time road closure.

Specification

Options & finishes

Deck
Composite concrete on steel deck · steel plate with anti-slip surfacing · steel grating · FRP or timber-look composite planks
Parapets
Glass, perforated or expanded mesh, vertical bars, stainless handrails with integrated LED lighting
Enclosure
Open, canopy roof, fully enclosed skywalk with glazing, louvres and ventilation
Corrosion protection
Hot-dip galvanizing, epoxy / polyurethane systems or duplex – ISO 12944 C4–C5, durability high to very high
Access
Stair towers, accessible ramps, lift shafts and landings designed with the bridge
Architecture
Architectural colours, feature lighting, signage and anti-throw screens over roads and rail

Process

How we deliver

  1. 1

    Brief & concept

    Site, span, width, codes and design life – typology and budget options.

  2. 2

    Design & dynamics

    Calculations, dynamic analysis, IFC model and approval drawings.

  3. 3

    Certified fabrication

    EXC3 / CC3 fabrication, ISO 3834-2 welding, NDT and trial assembly.

  4. 4

    Coating & shipping

    C4–C5 coating, modular packing, export logistics and documentation.

  5. 5

    Assembly & lift-in

    Ground assembly, single lift, fit-out – supervised by our engineers.

  6. 6

    Handover

    Quality dossier, as-built model, inspection and maintenance plan.

FAQ

Frequently asked questions

Which span can a steel pedestrian bridge reach?

Girder footbridges are typically economical up to about 35 m, trusses up to about 60 m in a single span and arches beyond that. Longer crossings use intermediate piers or cable-supported forms – we propose the most efficient typology for your site.

Can the bridge be installed without closing the road for long?

Yes. The bridge is fabricated and trial-assembled in the factory, assembled on site next to the crossing and lifted in as one piece, usually during a night-time closure.

How do you prevent bouncy or swaying footbridges?

Every design is checked dynamically against the comfort criteria of the applicable code (AASHTO, EN 1990 Annex A2, AS 5100 or the owner's brief). Stiffness, mass or tuned mass dampers are used where required.

Which standards do you design to?

AASHTO LRFD and the AASHTO pedestrian bridge guide specification in the US, AS 5100 in Australia, Eurocodes (EN 1991-2, EN 1993-2, EN 1090) in Europe and TCVN 11823 in Vietnam – or the code named in your specification.

Can World Steel supply federally funded bridges in the US?

Projects with federal-aid highway funding fall under Buy America rules requiring domestically produced steel. World Steel supplies privately funded and non-federal projects; confirm the funding source at tender.

What corrosion protection do you recommend?

For most outdoor footbridges a hot-dip galvanized or zinc-rich epoxy / polyurethane system to ISO 12944 C4–C5 with high or very high durability; duplex systems where colour and very long life are both required.

Planning a pedestrian crossing?

Send us the site plan, span, width and design code – our engineers return a concept, typology options and a delivered price.

Discuss your bridge +84 902 881 833

Delivery terms · Incoterms® 2020

Delivered on the terms you need

World Steel quotes ex-factory, free on board or delivered to your port or site. Export packing, documents and shipment from Ho Chi Minh City are part of our service.

Compare all Incoterms® 2020 →