Safe, sequenced steel erection – safety first, then quality, then finish.
Our site teams erect steel structures and pre-engineered buildings from anchor bolts to roofing, walls and handover.
Erection follows a planned sequence set out in the erection drawings and the crane movement plan. Our priorities on site are fixed in this order: safety first, then quality, then aesthetics.
Frames are stabilised with temporary bracing and purlins as erection proceeds, starting from the braced bay; roof and wall panels are installed only after the frames and purlins have been aligned. For overseas projects, the erection drawings, erection sequence and package marking prepared by our engineers support the local erection contractor.
Materials, drawings, method statement and labour.
Setting and survey of anchor bolts.
Columns erected and braced with struts.
Rafters or trusses lifted, purlins fixed.
The first braced frames adjusted to tolerance.
Following frames erected and completed.
Roof panels installed.
Wall panels installed.
Doors, louvers, gutters, finishing.
Quality evaluation, handover and start-up.
Featured Quang Ngai Province, Vietnam
Vinh Long Province, Vietnam
Hai Phong City, Vietnam
Can Tho City, Vietnam
Tay Ninh Province, Vietnam
Tay Ninh Province, Vietnam
المشروع القادم
أرسلوا إلينا مخططاتكم أو نموذج IFC – يرد فريق التسعير لدينا بنطاق التصنيع والجدول الزمني والسعر شاملاً التسليم.