Trims and flashings

Trims and flashings for PEB cladding: ridge, eave, rake, corner, base and opening trims, closures and sealants, lap rules, materials and installation tips.

Atualizado 4 min de leitura Ver no modelo 3D →

Rake trim, corner trim and base trim on the cladding of a steel building
Trims close the edges of the roof and wall sheeting and keep water out.

What trims and flashings do

Trims and flashings are folded sheet-metal profiles that close every edge, corner and opening of the building envelope. They have three jobs: keep water and wind out where sheets stop or change direction, hide cut edges and framing for a clean appearance, and accommodate movement between the cladding and the structure. Although they represent a small part of the steel tonnage, poor flashing details are responsible for a large share of leaks in steel buildings. A complete PEB envelope can include a hundred or more different trim pieces, all scheduled on the roof and wall sheeting drawings.

Main trim types

Typical PEB trims and flashings
TrimLocationFunction
Ridge cap / ridge flashingRoof apexCovers the gap between the two roof slopes
Eave trimJunction of roof and sidewall (no gutter)Closes the top of the wall sheets and the roof sheet end
Rake (gable) trimSloping edge of the roof at the endwallCovers roof and wall sheet edges along the gable
Corner trimOutside and inside wall cornersCloses wall sheet edges at corners
Base trim / base angleBottom of wall sheets at the slab or curbDrip edge that directs water away from the slab
Jamb, head and sill trimsDoors, windows, louversWeather-seal framed openings
Transition / high-side trimRoof step, lean-to junction, single-slope high sideSeal changes of roof plane
Penetration flashingPipes, ducts, fansSeal around roof penetrations

Closures, sealants and fasteners

Trims are only weather-tight with the right ancillaries:

  • Profiled closures (foam or rubber shaped to the sheet ribs) fill the voids under ridge, eave and high-side trims and keep out wind-driven rain, insects and birds.
  • Sealants – non-skinning butyl tape mastic at laps and closures, and neutral-cure silicone or polyurethane where exposed – must be compatible with the coating.
  • Fasteners – self-drilling screws and stitch screws or sealed blind rivets matching the trim colour, with EPDM washers; spacing typically 300–450 mm along trims. See structural bolts and cladding fasteners.
Through-fastened trapezoidal and standing seam roof profiles
Trim shapes follow the sheet profile; standing seam roofs need trims that allow thermal movement.

Detailing rules

  1. Shingle principle: every upper piece laps over the lower piece in the direction of water flow; never rely on sealant alone.
  2. Laps: typically 100–150 mm between trim lengths, with sealant and stitch fasteners; stagger laps away from sheet laps.
  3. Turn-ups and stop-ends: turn up roof sheet pans under ridge and high-side flashings to stop water being blown uphill.
  4. Drip edges: fold hems at the lower edge so water drips clear of the face below.
  5. Movement: on long buildings and standing seam roofs, use sliding or floating flashings and expansion joints so thermal movement does not tear fixings.
  6. Compatibility: avoid contact between coated steel and copper, lead or treated timber run-off; isolate aluminium.
  7. Wind: trims at corners, eaves and rakes sit in high-pressure zones; fastener spacing must suit the wind design.

Special flashings and trim schedule

Beyond the standard edge trims, many buildings need special flashings where structures meet or where the roof changes plane. These pieces are detailed individually and checked carefully because they are where leaks most often start.

Special flashings and where they are used
FlashingWhere it is usedKey detailing point
Valley flashingInternal corner where two roof slopes meet in planWide, well-supported pan; roof sheets cut and turned down into it
Apron (lean-to) flashingLower roof abutting a higher wallUpstand behind the wall sheet; counter-flashing laps over it
Parapet cappingTop of parapet wallsFalls inward to the roof; laps sealed and fixed on the sides, not the top
Curved eave panel and trimsRounded roof-to-wall transitionMatched profile; see the curved eaves article
Expansion joint flashingAcross building expansion jointsFlexible or sliding cover that allows movement in both directions
Masonry or dado wall flashingSteel wall sheeting above a block wallDrip trim set in or over the wall top so water does not enter the joint
Fascia and soffit trimsFascia tops, bottoms and returnsCap the fascia so water cannot enter the bracket zone

Trim schedule. Each trim is identified by a mark number, a cross-section with girth and bend angles, material and colour, length and quantity. Common girths range from about 150 mm for small corner trims to 600 mm or more for ridge, valley and parapet capping pieces; trims are typically supplied in lengths of 3–6 m to suit handling and packing. A clear schedule makes site sorting faster and allows replacement pieces to be ordered accurately years later.

Materials, installation and maintenance

Trims are press-braked or roll-formed from the same pre-painted metallic-coated coil as the cladding, commonly 0.45–0.6 mm, so colour and corrosion resistance match. Cut edges should be kept short and burr-free, and swarf removed the same day. During inspections (see maintenance and inspection) check for loose fasteners, sealant breakdown, displaced closures and damaged trims around doors where forklifts operate.

World Steel folds all trims and flashings in-house as part of the cladding and accessories scope, with each piece marked to the erection drawings; related details for gutters and fascias are coordinated in the same drawing set.

Normas por região

RegiãoNormaEscopo
United States SMACNAArchitectural Sheet Metal Manual – flashing practice
United States ASCE 7-22 Ch. 30Wind pressures for edge and corner zones
Canada NBC 2020 Part 5Environmental separation – rain penetration control
Australia / NZ SA HB 39Installation code for metal roof and wall cladding
Europe EN 14782Self-supporting metal sheet for roofing, cladding and lining

Perguntas frequentes

What is the difference between a trim and a flashing?

The terms overlap. A flashing is primarily a weatherproofing piece that diverts water, while a trim is a finishing piece that covers edges; most PEB edge pieces do both.

Why are foam closures needed under ridge flashings?

The ribs of profiled sheets leave open voids under a flat flashing. Profiled closures fill these voids to block wind-driven rain, dust, insects and birds.

Can sealant fix a leaking flashing?

Only temporarily. Durable weather-tightness comes from correct laps, turn-ups and drip edges; sealant is a secondary barrier and needs periodic renewal.