الفصل 13 من 13 · Sections 4–13 · Appendices B, D and E

Assessing a CC3 structural steel fabricator – the complete checklist

A complete checklist for assessing a structural steel fabricator against AS/NZS 5131 CC3 – certification, quality system, welding, coatings, tolerances, records.

One checklist across the whole standardDesk review, factory audit and first-off inspectionRed flags that should stop an awardExtra checks for offshore fabrication

Why assess the fabricator, not only the steel

Most of what AS/NZS 5131 requires cannot be seen on a finished member. Whether a weld was made to a qualified procedure, whether a plate came from the heat number on the certificate, whether the blast profile was right before the primer went on – these are established by the fabricator's system and records, not by looking at the steel when it arrives on site. That is why the standard places so much weight on the construction specification, the quality plan and inspection and test plan, qualified personnel and traceable records, and why the higher construction categories demand more of each.

For a builder or engineer, assessing the fabricator before award is the cheapest point to control risk. A fabricator that cannot show its system at tender stage will not produce the evidence at handover. This chapter collects the checks from every chapter of this guide into one assessment you can use for any fabricator – local or overseas – and shows the evidence World Steel provides for each.

Three stages of assessment

A practical assessment for CC3 work has three stages, each building on the last:

  1. Desk review at tender – certificates and their scope, the quality manual and a sample quality plan, a sample ITP, welding procedures with qualification records, welder and NDE personnel qualifications, NDE procedures, a sample coating inspection report and a sample manufacturer's data report.
  2. Factory audit before award or before the first release – in person or by structured video audit: material receipt and storage, identification and transfer of heat numbers, cutting and drilling, fit-up and welding, NDE, blasting and painting, measurement, nonconformance records and packing.
  3. First-off and production inspection – the first assemblies of each type inspected against the drawings and the ITP before the batch proceeds, then hold and witness points through production and a pre-shipment inspection.

Certification by an accredited body does not replace project inspection – it shows that the system has been independently assessed, so the project inspection can focus on the specific job.

The CC3 assessment checklist by area

Fabricator assessment for CC3 – World Steel summary (see each chapter for the clauses)
AreaKey questionEvidence to seeChapter
CertificationIs the fabricator certified to AS/NZS 5131 at the required category, for this site?Certificate, schedule and register entry of an accredited certification bodyConstruction categories
Contract reviewAre the specification, drawings and RFIs reviewed and recorded before fabrication?Review records, RFI register, approved shop drawingsSpecification
Quality systemIs there a quality plan and project ITP with competent supervision for each process?Quality plan, ITP, supervisor nominations and qualificationsQuality management
MaterialsAre steel, consumables and fasteners compliant and traceable to the members?Mill certificates, receipt inspection, traceability recordsMaterials
FabricationAre cutting, holing, forming and assembly controlled to the standard?Process instructions, first-off checks, assembly check recordsFabrication
WeldingAre procedures and welders qualified to AS/NZS 1554 and NDE done to the CC3 extents by qualified people?WPS/PQR, welder records, NDE procedures and reportsWelding
BoltingAre bolting categories, holes, contact surfaces and assemblies controlled?Bolt lists, fastener certificates, contact surface recordsBolting
Corrosion protectionIs the coating system planned and inspected for the exposure and design life?Coating plan, blast and DFT records, galvanizing certificatesCoatings
TolerancesAre essential and functional tolerances measured and recorded?Dimensional reports, trial assembly records where specifiedTolerances
Inspection & recordsCan you witness hold points and will you receive complete records and a declaration?ITP sign-offs, nonconformance register, data report, declaration of complianceInspection

Red flags

Some findings should stop an award for CC3 work until they are resolved:

  • A certificate that does not name AS/NZS 5131, names a lower category than required, covers a different site, or cannot be found on the certification body's register.
  • No project-specific ITP, or an ITP without hold points and without a place for the client's inspector.
  • Welding procedures that are not qualified for the processes, positions and steel grades on the job, or welders without current qualification records.
  • NDE carried out by people without recognised qualifications, or NDE extents below those the construction category requires.
  • Mill certificates that cannot be linked to the members, or steel to standards other than those specified without an approved equivalence.
  • No nonconformance register, or a register with no entries – every real fabrication shop records nonconformances.
  • Records that are incomplete, not in English or only promised for "after delivery".

Additional checks for offshore fabrication

The standard applies equally wherever the steel is made, but distance changes how the evidence is obtained. For a fabricator outside Australia, agree in the contract:

  • Inspector access – hold and witness points that your inspector or a nominated third party can attend in person, or witness by live video where the certifier accepts it.
  • Australian-standard materials – steel to AS/NZS 3678, 3679.1 and 1163 (or approved equivalents), ACRS-certified where the specification requires it, with certificates linked to piece marks.
  • Records before shipment – inspection records and certificates for each shipment reviewed before release, not after arrival.
  • Packing and sequence – marking, bundling and loading by erection sequence, with packing lists that match the erection drawings.
  • Coating repairs and transport damage – a repair procedure for site touch-up and a clear split between the fabricator's and the erector's responsibilities.

World Steel's offer to Australian builders is organised around exactly these points – see our Australian supply chain and, for steel-framed buildings, Modular Homes Australia.

World Steel's answers

World Steel is certified by BSI Group Australia and New Zealand for fabrication to AS/NZS 5131 at CC3 – Benchmark certificate BMP 827566, valid to 31 July 2030 – with welding quality certified to ISO 3834-2. For each Australian project we provide a quality plan and ITP with hold and witness points open to the client's inspector in person or by video, welding to AS/NZS 1554.1 with qualified procedures and welders, NDE and dimensional records, coating and galvanizing records, weekly progress reports, a pre-shipment inspection and a manufacturer's data report with a declaration of compliance at handover.

Ask for our evidence pack at tender stage and assess us against this checklist – we would rather answer every question before steel is cut. Visit the factory in person or by video.

قائمة تحقق المقيِّم

ما يجب على المهندس أو البنّاء أو المدقق التحقق منه لدى مصنّع CC3 في هذا الجزء من AS/NZS 5131 – والأدلة التي ينبغي طلبها.

البند · CCما يجب التحقق منهالأدلة
Appendix C AllThe fabricator's AS/NZS 5131 certification covers the construction category and the site that will make the steel.Construction specification, certificate and schedule
4.1, App. B AllThe construction specification has been reviewed and gaps raised as RFIs before fabrication.Contract review record, RFI register
App. D, E CC2–CC4A quality plan and project ITP exist with hold and witness points agreed with the client.Quality plan, project ITP
4.7, 5.2 CC3Materials are certified and traceable to the members to the level the category requires.Mill certificates, traceability records
7.2–7.4 CC2–CC4Welding is planned, procedures and welders are qualified and a competent welding supervisor is appointed.Welding plan, WPS/PQR, welder records, supervisor CV
13.6 CC3NDE is carried out to the CC3 extents by qualified personnel and recorded.NDE procedures, operator qualifications, reports
8, 13.7 AllBolting categories, holes and contact surfaces match the design and are recorded.Bolt lists, fastener certificates
9, 13.8–13.10 AllCorrosion protection is planned and inspected for the specified system.Coating plan, inspection reports, galvanizing certificates
12, App. F AllEssential and functional tolerances are measured and recorded before dispatch.Dimensional reports
13 AllNonconformances are controlled and a complete record set and declaration are delivered.Nonconformance register, data report, declaration of compliance

في مصنعنا

كيف تطبّقه World Steel

01Certified at CC3BSI Benchmark certificate BMP 827566 for AS/NZS 5131 CC3, valid to 31 July 2030, verifiable on the BSI register.
02Evidence at tenderQuality plan, sample ITP, welding procedures, welder and NDE records and a sample data report supplied with the tender on request.
03Open factoryHold and witness points open to the client's inspector in person or by live video, with a pre-shipment inspection for every shipment.
04Complete handoverManufacturer's data report with all inspection records and a declaration of compliance, in English.

الأسئلة المتكررة

Is AS/NZS 5131 certification mandatory for a fabricator?

The standard itself sets requirements for the work, not for certification. Many Australian specifications and builders, however, require fabricators to be certified by an accredited body at the construction category of the project, because certification shows the system has been independently audited.

What should I ask a fabricator for at tender stage?

The certificate and its schedule, a sample quality plan and ITP, welding procedures with qualification records, welder and NDE personnel qualifications, sample NDE and coating reports, and a sample manufacturer's data report with a declaration of compliance.

Can a factory audit be done by video?

Many clients combine a document review with a structured live video audit of the factory, followed by in-person or video witness of the first hold points. Whether video witness is acceptable for a project is agreed with the client and the certifier.

How does World Steel support an assessment?

World Steel supplies its evidence pack on request, hosts factory audits in person or by video, and agrees the ITP with hold and witness points before fabrication so the client's inspector can follow the job.

تحتاجون إلى مصنّع CC3 لمشروع في أستراليا؟

أرسلوا المخططات ومواصفات البناء وفئة البناء – نرد بخطة فحص واختبار وقائمة المستندات وسعر مفصّل.

اطلب عرض سعراعرض شهادة AS/NZS 5131 CC3 لدينا