- Two profiles: WS 1000-50-3 and WS 900-75-3
- Thickness 0.58–1.60 mm, G300–450
- Acts as formwork and reinforcement
- Embossed webs for composite action
Formwork and reinforcement in one
Steel decking is laid on the beams as a working platform, carries the wet concrete as permanent formwork and then works with the slab as tension reinforcement. With shear studs welded through to the beams, deck, slab and beams act compositely – lighter floors and faster construction for multi-storey buildings and mezzanines.
Profiles and technical data
| Code | Cover (mm) | Coil width (mm) | Rib (mm) | Thickness (mm) | Yield |
|---|---|---|---|---|---|
| WS 1000-50-3 | 1000 | 1200 | 50 | 0.58–1.50 | G300–450 |
| WS 900-75-3 | 900 | 1200 | 75 | 0.75–1.60 | G300–450 |
Unpropped spans and slab capacities depend on deck thickness, slab depth and loads – ask for the span tables for your design code.
תקנים ודרישות לפי שוק
התקנים שלפיהם World Steel מתכננת, מייצרת ומתעדת מוצר זה – ודרישות הגיאומטריה והעומס העיקריות בכל שוק.
ארצות הברית
- SDI C / SDI RDComposite and roof deck standards
- ASTM A653Galvanized structural sheet
- AWS D1.3Welding of sheet steel
אוסטרליה / ניו זילנד
- AS/NZS 2327Composite structures
- AS 1397Metallic-coated steel sheet
- AS/NZS 4600Cold-formed steel structures
אירופה
- EN 1994-1-1Composite steel and concrete structures
- EN 1993-1-3Cold-formed members and sheeting
- EN 10346Hot-dip coated steel
סיכום להתמצאות בלבד – מפרט הפרויקט, מהדורת התקן שאומצה והרשות המוסמכת הם הקובעים.
גימורים
| גימור | תקנים / הערות |
|---|---|
| Galvanized | Z180–Z275 |
שאלות נפוצות
Does the deck need props?
Up to the unpropped span for the chosen deck and slab no props are needed; longer spans need temporary propping during concreting.