Anchor bolts & chemical anchors

Anchor bolt assemblies, cages & templates

Pre-assembled anchor bolt cages with top templates, bottom rings, sleeves and levelling nuts – set as one unit before the pour so every column fits.

미국호주 / 뉴질랜드유럽

견적 요청 사양

  • Bolt group pre-assembled in the shop
  • Steel or plywood top templates
  • Bottom ring plate holds spacing
  • Sleeves for adjustment
  • Levelling nuts and plate washers
  • Tagged by grid line and foundation

Why cages

Most site problems with steel erection start at the foundation: anchor bolts out of position, rotated or set at the wrong projection. A cage holds the whole bolt group – with a template at the top and a ring plate at the bottom – so it is placed, levelled and tied to the reinforcement as one piece.

What we supply

  • Anchor bolts to F1554, AS 1111 or ISO 898-1
  • Top template plate drilled from the column base plate drawing
  • Bottom ring or spacer plate, tack-welded where permitted
  • Plastic or steel sleeves for ± adjustment
  • Levelling nuts, plate washers, thread protection
  • Tag with foundation mark and grid

Setting

  • Check the template against grid lines and level before the pour
  • Tie the cage to the reinforcement – not to the formwork
  • Protect threads; remove templates after the concrete has set
  • Survey bolt positions before steel erection

시장별 표준 및 요구사항

World Steel이 본 제품의 설계, 제작, 문서화에 적용하는 기준 – 그리고 각 시장의 주요 형상 및 하중 요구사항.

미국

  • AISC 303Code of Standard Practice – anchor rod tolerances
  • ACI 117Tolerances for concrete
Position tolerance
per AISC 303 §7.5
United States 표준 전체 →

호주 / 뉴질랜드

Australia & New Zealand 표준 전체 →

유럽

Europe 표준 전체 →

참고용 요약입니다 – 프로젝트 시방서, 채택된 기준 판본 및 관할 기관의 요구가 우선합니다.

표면 처리

표면 처리표준 / 비고
BoltsHot-dip galvanized
TemplatesPrimed or plain