Anchor bolts & chemical anchors

Anchor bolt assemblies, cages & templates

Pre-assembled anchor bolt cages with top templates, bottom rings, sleeves and levelling nuts – set as one unit before the pour so every column fits.

美国澳大利亚 / 新西兰欧洲

索取报价 技术规格

  • Bolt group pre-assembled in the shop
  • Steel or plywood top templates
  • Bottom ring plate holds spacing
  • Sleeves for adjustment
  • Levelling nuts and plate washers
  • Tagged by grid line and foundation

Why cages

Most site problems with steel erection start at the foundation: anchor bolts out of position, rotated or set at the wrong projection. A cage holds the whole bolt group – with a template at the top and a ring plate at the bottom – so it is placed, levelled and tied to the reinforcement as one piece.

What we supply

  • Anchor bolts to F1554, AS 1111 or ISO 898-1
  • Top template plate drilled from the column base plate drawing
  • Bottom ring or spacer plate, tack-welded where permitted
  • Plastic or steel sleeves for ± adjustment
  • Levelling nuts, plate washers, thread protection
  • Tag with foundation mark and grid

Setting

  • Check the template against grid lines and level before the pour
  • Tie the cage to the reinforcement – not to the formwork
  • Protect threads; remove templates after the concrete has set
  • Survey bolt positions before steel erection

各市场标准与要求

World Steel 设计、加工本产品及编制文件所依据的规范——以及各市场的主要几何与荷载要求。

美国

  • AISC 303Code of Standard Practice – anchor rod tolerances
  • ACI 117Tolerances for concrete
Position tolerance
per AISC 303 §7.5
全部United States标准 →

澳大利亚 / 新西兰

全部Australia & New Zealand标准 →

欧洲

全部Europe标准 →

摘要仅供参考——以项目技术规格书、所采用的规范版本及主管机构要求为准。

表面处理

表面处理标准 / 备注
BoltsHot-dip galvanized
TemplatesPrimed or plain