신뢰 구축, 성공 보장 고객 포털 dang.victor@worldsteelgroup.com +84 902 881 833
World SteelBuilding trust, Assuring success

WS steel doors, frames & roll-up doors

Pre-assembled walk doors for metal buildings

Factory-assembled door, frame, sub-frame and hardware that bolts into the girts of a steel building – installed in about 30 minutes, wind- or fire-rated.

미국호주 / 뉴질랜드유럽

견적 요청 사양

  • Door, frame, sub-frame and hardware assembled
  • 3070 · 4070 · 6070 pair
  • 20 or 18 ga door, 16 ga frame
  • Bolts to girts – install in ~30 min
  • Wind-rated or fire-rated versions
  • Bronze or white finish

Made for the girt system

A steel building does not have a masonry wall to anchor into – it has girts and sheeting. The pre-assembled walk door arrives with its own steel sub-frame and girt attachments, so the crew sets the unit in the framed opening, bolts it to the girts and flashes it to the sheeting. Field installation usually takes under 30 minutes.

Because the opening is built into our steel buildings, World Steel details the framed opening, the girts and the door together – the right size, in the right place, on the first day.

Specification

Pre-assembled range
SizeLeafFrameHandLock prepAstragal
307020 or 18 ga16 gaNon-handed161, ASA strike–
407020 or 18 ga16 gaNon-handed161, ASA strike–
6070 pair20 or 18 ga16 gaNon-handed161, ASA strikeZ-astragal
  • Galvannealed steel, polystyrene core (polyurethane optional), 1¾ in
  • Bolted corners, steel sub-frame with girt attachments
  • 7 ga hinge and 12 ga closer reinforcements, lock box construction
  • 4½ × 4½ in ball bearing hinges, non-removable pins, silver powder coat
  • 5 in × ½ in aluminium saddle threshold, ADA compliant
  • Kerf and sweep weather seals, detachable flashing

Hand and swing

Metal-building walk doors usually swing out (reverse hand) so wind pressure pushes the door into the stops. The leaf is non-handed and the frame is set for the hand on site.

Door handing
Door handing – LH, RH, LHR and RHR.

시장별 표준 및 요구사항

World Steel이 본 제품의 설계, 제작, 문서화에 적용하는 기준 – 그리고 각 시장의 주요 형상 및 하중 요구사항.

미국

  • ANSI/SDI A250.8Standard steel doors and frames (SDI-100)
  • ANSI/SDI A250.6Hardware reinforcings on steel doors and frames
  • ANSI/DHI A115 seriesHardware preparation in steel doors and frames
  • ASTM A653 / A924Galvannealed steel sheet A40 / A60
  • NFPA 80 · UL 10CFire doors – installation and positive-pressure fire test
Fire label
20 min to 3 h on a labelled door and frame
Accessibility
ADA / ICC A117.1 – threshold rise ≤ ½ in
United States 표준 전체 →

호주 / 뉴질랜드

  • AS 1905.1Fire-resistant doorsets
  • AS 1530.4Fire-resistance tests of elements
  • NCC Volume OneEgress, fire separation and access
  • AS 1428.1Design for access – door circulation and hardware
Fire doorset
door, frame and hardware tested as one assembly
Australia & New Zealand 표준 전체 →

유럽

  • EN 14351-1Windows and external pedestrian doorsets – CE marking
  • EN 16034Fire and smoke resisting doorsets – CE marking
  • EN 1634-1Fire resistance test for doorsets
  • EN 1192Doors – classification of strength requirements
CE marking
Declaration of performance for each doorset type
Europe 표준 전체 →

참고용 요약입니다 – 프로젝트 시방서, 채택된 기준 판본 및 관할 기관의 요구가 우선합니다.

표면 처리

표면 처리표준 / 비고
ColoursBronze or true white factory finish
HingesSilver powder coat

자주 묻는 질문

What is the difference between pre-assembled and knock-down?

Pre-assembled doors arrive as a complete hung unit with sub-frame and hardware. Knock-down doors ship boxed with the frame in parts – cheaper to ship, a little more work on site.

다음 프로젝트

해외 철골 구조물을 계획 중이십니까?

도면 또는 IFC 모델을 보내주십시오. 견적팀이 제작 범위, 일정 및 인도 가격을 회신해 드립니다.