建立信任,确保成功 我的门户 dang.victor@worldsteelgroup.com +84 902 881 833
World SteelBuilding trust, Assuring success

DPU

Delivered at Place Unloaded

As DAP, but the seller also unloads at the named place.

按项目任何运输方式Incoterms® 2020

WS工厂出口清关装运港装上船主运输卸货港进口清关贵方工地DPUWorld Steel(卖方)承担风险买方承担风险仍由卖方支付的费用风险转移

World Steel 如何按 DPU 交货

Delivered and unloaded at a named terminal or site, by arrangement – useful where our team supervises erection.

交货
Unloaded at the named place of destination.
风险转移
When the goods are unloaded at the named place.
费用
The seller pays transport and unloading; the buyer clears import and pays duties.
适用场景
Sites where the seller is better placed to unload heavy or long members.
注意事项
The seller must be able to unload at the named place – check cranes and access.
2020 新变化
2020: DPU replaces DAT and can be any place, not only a terminal.

务必写明术语、指定地点和版本,例如“DPU 贵方港口 / 工地, Incoterms® 2020”。

Incoterms® is a registered trademark of the International Chamber of Commerce (ICC). This page summarises the Incoterms® 2020 rules for orientation only – the ICC text and the sales contract govern. Always state the rule, the named place and “Incoterms® 2020”.

按 DPU 为您的项目报价

告诉我们目的地和您偏好的术语——我们可报出厂价、FOB、CIF 或送达工地价。

索取报价