- 54 m² · 1 module
- Two bedrooms, bathroom core
- Galvanised Q355 steel frame
- Factory-built bathroom pod and MEP rough-in
- Up to ≈ 91 % completed in the factory
- Base, Fire-rated (FRL 60/60/60 target) or custom
The home
The bedroom module of the WS range: two generous bedrooms with their own glazed doors to the deck and a shared bathroom core between them. Combine it with a living module to make a family home, or repeat it for guest rooms, eco-lodges and student housing.
What is built in the factory
- Steel frame – galvanised Q355 frame engineered for strength, precision and durability, with corner posts for lifting and stacking.
- Wet core – factory-built bathroom pod for quality and consistency.
- MEP rough-in – services pre-installed for fast connection on site.
- External envelope – high-performance thermal and weather protection.
- Interior fit-out – finishes designed for comfort and function.
- Dispatch ready – inspected, wrapped and ready for safe transport.
Every WS model shares the same module system – frame, floor, walls, roof, wet core and services – so specifications, approvals and spare parts stay consistent across a project.
Variants
Choose WS-ML-01 Base for standard residential or accommodation use, WS-ML-02 Fire-rated where enhanced fire performance is required, or a project-custom build-up – see the variant table on the module system page.
各市场标准与要求
World Steel 设计、加工本产品及编制文件所依据的规范——以及各市场的主要几何与荷载要求。
澳大利亚 / 新西兰
- NCC 2022 Vol. 1 & 2Building Code of Australia – Class 1a / 2 / 3 as applicable
- AS/NZS 1170Structural design actions incl. wind regions
- AS 4100 · AS/NZS 4600Steel and cold-formed steel structures
- AS 1530.4Fire-resistance tests – FRL
- AS 3740Waterproofing of domestic wet areas
- AS/NZS 3000 · AS/NZS 3500Electrical installations · plumbing and drainage
- Fire-rated variant
- FRL 60/60/60 target with tested or assessed systems
- Approval
- Building certifier per state; transport permits per route
美国
- IBC / IRCInternational Building / Residential Code
- ICC/MBI 1200 & 1205Off-site construction: planning, inspection, regulatory compliance
- ASCE 7 · AISC 360Loads and steel design
- NEC · IPCElectrical and plumbing codes
- Approval
- State modular / industrialised building program where applicable
欧洲
- EN 1990 – EN 1993Eurocodes – basis, actions, steel
- EN 13501-2Fire resistance classification (REI)
- EN 1090-2 WSC 已认证Execution of steel structures – WS EXC3
- Approval
- National building rules and energy performance per country
摘要仅供参考——以项目技术规格书、所采用的规范版本及主管机构要求为准。
表面处理
| 表面处理 | 标准 / 备注 |
|---|---|
| Exterior | Insulated wall panel with charcoal frame trim; cladding options to suit |
| Deck | Timber or composite deck to project |
| Interior | Lining and paint, vinyl plank flooring, cabinetry and joinery |
| Project finishes | Colours, fixtures and fittings on request |
常见问题
How long does production take?
Typically 4–6 weeks of factory production per batch after design approval, while foundations and site works proceed in parallel.
How much is finished in the factory?
Up to about 91 % of the work – frame, envelope, wet core, services and finishes. On site the modules are set on footings and connected to services.
Can the layout or finishes be changed?
Yes – finishes, fixtures, window positions and the build-up can be tailored as a project-custom variant.







