בונים אמון, מבטיחים הצלחה פורטל לקוחות dang.victor@worldsteelgroup.com +84 902 881 833
World SteelBuilding trust, Assuring success

WSC PEB products

Canopies, fascias and parapets

Canopies, fascias and parapets for steel buildings: cantilever canopies, roof extensions and fascia systems designed and fabricated by WSC with the PEB.

עודכן 3 דקות קריאה צפייה במודל התלת-ממדי →

Cantilever canopy and fascia panels on the front of a pre-engineered steel building
Canopies shelter loading docks and entrances; fascias and parapets shape the building front.

Scope of supply

Canopies, fascias and parapets give a PEB its architectural face and protect loading areas from rain and sun. World Steel designs and fabricates them as part of the building so their loads are included in the frame design; see canopies, fascias and parapets for the technical background.

  • Cantilever canopies at the eave or below the eave, with tapered built-up rafters or cold-formed purlin members.
  • Roof extensions continuing the main roof beyond the sidewall.
  • Fascia systems: brackets, girts and panels forming a vertical or sloped face.
  • Parapets extending the wall above the roof, with capping and box gutters behind.
  • Soffit panels, trims and gutters for canopies.

Options and variants

Typical canopy and fascia options
ItemTypical rangeNotes
Eave canopy projectionAbout 1.5–6 mLonger projections need heavier rafters and back-span checks
Below-eave canopyAbout 1.5–4 mCommon over loading docks
Fascia heightAbout 0.6–2.0 mFlat or mansard profile
Parapet heightAbout 0.6–1.5 mRequires box gutter and snow-drift check

Canopy members can be tapered I-sections bolted to the columns, or light cold-formed members for short projections. Fascias can use the standard wall profile, a reverse profile, flat panels or composite aluminium panels supplied locally. Wind uplift on a canopy and wind on a parapet are both high, so connections are designed for these local pressures.

Wind pressure on walls and roof
Canopies and parapets attract higher local wind pressures.

Materials and finishes

Structural members follow the primary framing plate grades and paint system; secondary members and panels follow the cladding materials. Soffit liners are usually pre-painted steel in a light colour. Where a canopy is exposed to sea spray or vehicle exhaust, hot-dip galvanizing or a higher ISO 12944 category is recommended.

Compliance by market

Compliance by market
MarketDesign codeFabrication / weldingMaterialsCertification notes
United StatesASCE 7-22 (canopy and parapet wind provisions, snow drift), AISC 360-22, AISI S100AWS D1.1 / D1.3ASTM A572, A653, A792WSC holds IAS AC472 accreditation for metal building systems; welding qualified to AWS D1.1 (structural) and AWS D1.3 (sheet steel). AISC Certification is not held – confirm acceptance if specified.
CanadaNBC 2020, CSA S16-19, CSA S136-16CSA W59CSA G40.21 / accepted ASTMDesigned to CSA S16 / CSA S136 by WSC or the engineer of record. CSA W47.1 (CWB) company certification is a market requirement, arranged per project.
Australia / New ZealandAS/NZS 1170.2 canopy and parapet coefficients, AS 4100, AS/NZS 4600AS/NZS 5131 CC3, AS/NZS 1554.1AS/NZS 3678, AS 1397WSC is certified to AS/NZS 5131 Construction Category CC3; welding to AS/NZS 1554.1. For New Zealand, SFC certification is not held – confirm acceptance per project.
EuropeEN 1991-1-4 canopy roofs and parapets, EN 1991-1-3 snow, EN 1993EN 1090-2EN 10025-2, EN 10346WSC is certified to EN 1090-2 Execution Class EXC3 and ISO 3834-2. CE marking via EN 1090-1 factory production control to be confirmed per project.

Wind, drainage and detailing references

Design references for canopies, fascias and parapets
TopicUnited StatesAustralia / NZEurope
Wind on overhangs and canopiesASCE 7-22 provisions for roof overhangs, open buildings and attached canopiesAS/NZS 1170.2 free roof and canopy coefficientsEN 1991-1-4 Section 7.3 (canopy roofs)
Wind on parapetsASCE 7-22 parapet provisions (MWFRS and components and cladding)AS/NZS 1170.2 parapet and free-standing wall coefficientsEN 1991-1-4 free-standing walls and parapets
Snow drift at parapets and lower canopiesASCE 7-22 Chapter 7AS/NZS 1170.3EN 1991-1-3
Box gutters behind parapetsIPC with ASCE 7-22 Chapter 8AS/NZS 3500.3EN 12056-3

Parapets need back-sheeting and capping on the roof side; fascias that hide gutters need overflows that discharge outward and safe access for cleaning. See canopies, fascias and parapets and roof extensions.

Documentation, packing and quotation

Deliverables include canopy and fascia framing drawings, calculations including local wind and snow drift, cladding and trim details, and erection drawings. Canopy rafters are packed with the primary frames; panels and trims with the cladding.

A quotation can be prepared quickly when the enquiry states the project location and the code to be used. Please send:

  1. Canopy location, projection and height.
  2. Fascia or parapet height, profile and finish.
  3. Any signage, lighting or solar loads on the canopy.
  4. Design wind and snow parameters.

World Steel returns a priced scope with a clear inclusions and exclusions list, the design basis assumed and a typical lead time. Enquiries go through the export supply team in Ho Chi Minh City.

תקנים לפי אזור

אזורתקןהיקף
United States ASCE 7-22Wind on canopies and parapets
Canada NBC 2020Structural loads
Australia / NZ AS/NZS 1170.2Wind actions
Europe EN 1991-1-4Wind actions including canopy roofs

שאלות נפוצות

How far can a canopy project?

Projections of about 1.5–6 m are common; longer canopies are possible with heavier members and a check of the supporting column.

Do parapets need special drainage?

Yes. A parapet traps water and snow, so a box gutter with overflows and a snow-drift check are required.

Can a canopy be added later?

It can, but the frame column must be checked for the added load; it is more economical to include it in the original design.

הפרויקט הבא

מתכננים מבנה פלדה בחו"ל?

שלחו לנו את השרטוטים או את מודל ה-IFC – צוות התמחור שלנו יחזור אליכם עם היקף הייצור, לוח זמנים ומחיר כולל אספקה.