نبني الثقة ونضمن النجاح بوابة العملاء dang.victor@worldsteelgroup.com +84 902 881 833
World SteelBuilding trust, Assuring success

WS modular handrail systems · Handrail systems · WS-MH-200

Side-mounted modular handrail

Fascia-mounted modular steel handrail bolted to the side of beams, channels or slab edges – keeps walkway width clear; galvanized, no site welding.

الولايات المتحدةأستراليا / نيوزيلنداأوروبا

اطلب عرض سعر المواصفات

  • Bolts to the side of beams, channels or slabs
  • Keeps the full walkway width usable
  • Same rails and fittings as the WS guardrail
  • Brackets for steel webs and concrete edges
  • No welding on site, galvanized components

What it is

A side-mounted (fascia-mounted) handrail is fixed to the vertical face of the edge member instead of the walking surface. World Steel’s WS-MH-200 uses a stanchion with a welded side bracket bolted through the web of a channel or beam, or anchored into the edge of a concrete slab. Above deck level it is the same system as the top-mounted guardrail – the same rails, fittings, toe boards and gates.

Side mounting is chosen where every millimetre of walkway width counts, where the deck is grating or chequer plate that should not be drilled, or on stair stringers and mezzanine edges where a fascia fixing simply looks cleaner.

Diagram of guardrail heights in the US, Australia and Europe
Guardrail heights by region set the fitting positions on every WS stanchion.

Types and options

Side-mount brackets
CodeBracketFixes to
WS-MH-210Flat bracket, 2 boltsChannel and PFC webs
WS-MH-220Angle bracket with packerBeam webs with flange clearance
WS-MH-230Stand-off bracketSlab edges, cladding or fire-protected members
WS-MH-240Stringer bracket (raked)Stair stringers

Design and compliance

Heights, rail loads and openings follow OSHA 1910.29, AS 1657 or EN ISO 14122-3 exactly as for the top-mounted system. The difference is the fixing: a side bracket transfers the barrier load into the web of the edge member as a moment, so the bolt group, the web thickness and the torsion of the edge member are checked. Where the edge member is light, a stand-off bracket bolted near a stiffener or cleat is used.

At toe-board level the gap between deck and toe board must stay within the code limit; World Steel details the toe board on the inside face of the stanchions so the gap is closed.

Installation and selection

  • Drill or punch the edge member in the shop – holes are detailed in the steel model when the handrail ships with the structure.
  • Bolt the stanchions, check verticality with the bracket packers, then fit rails and toe boards.
  • For concrete edges use the anchors in the fixing kits, with the edge distance checked.
  • Specify the edge member, bracket type, code and finish.

Fabrication and finishing at World Steel

Every WS modular handrail component is made in the World Steel plant in Vietnam: tube and bar are cut on saws to the component schedule, stanchions are welded to base plates, brackets or socket spigots on jigs so that rail heights repeat exactly, and fittings are fabricated from heavy-wall tube and plate, drilled and tapped for their locking screws. Welding follows qualified procedures under ISO 3834-2 and the AS/NZS 5131 and EN 1090-2 systems our certifications cover.

Components are then hot-dip galvanized as single pieces – which is only possible because the system is modular – giving full internal and external zinc coverage with no site welds to repair afterwards. A safety-yellow or architectural topcoat can follow. Parts are marked with their WS code, bagged by type and packed by area for export shipping, together with the structural steel or on their own.

المعايير والمتطلبات حسب السوق

المعايير التي تصمم World Steel هذا المنتج وتصنّعه وتوثّقه وفقها – والمتطلبات الهندسية الرئيسية ومتطلبات الأحمال في كل سوق.

الولايات المتحدة

  • OSHA 29 CFR 1910.29Fall protection systems – guardrails
  • ASCE 7Minimum design loads – guard systems
  • IBCInternational Building Code – guards
  • ASTM A123Hot-dip galvanized coatings
Top rail height
42 in ± 3 in (OSHA 1910.29(b))
Rail loads
Top 200 lbf, mid 150 lbf (OSHA 1910.29(b))
Max opening
19 in (OSHA 1910.29(b))
جميع معايير United States →

أستراليا / نيوزيلندا

  • AS 1657-2018Fixed platforms, walkways, stairways and ladders
  • AS/NZS 1170.1Imposed actions – barrier loads
  • AS/NZS 5131 معتمد لدى WSCFabrication and erection of structural steelwork
  • AS/NZS 4680Hot-dip galvanized coatings
Guardrail height
900–1100 mm (AS 1657)
Toe board
≥ 100 mm where required (AS 1657)
جميع معايير Australia & New Zealand →

أوروبا

  • EN ISO 14122-3Stairs, stepladders and guard-rails
  • EN 1991-1-1Imposed loads – barriers
  • EN 1090-2 معتمد لدى WSCExecution of steel structures
  • EN ISO 1461Hot-dip galvanized coatings
Guard-rail height
≥ 1100 mm (EN ISO 14122-3)
Rail gaps
≤ 500 mm (EN ISO 14122-3)
Toe-plate
≥ 100 mm (EN ISO 14122-3)
جميع معايير Europe →

ملخص للاسترشاد فقط – تسري مواصفات المشروع وإصدار المعيار المعتمد والجهة المختصة.

التشطيبات

التشطيبالمعايير / ملاحظات
Hot-dip galvanized (standard)ASTM A123 / A153 · AS/NZS 4680 · EN ISO 1461
Duplex – HDG + safety-yellow topcoatASTM A123 + topcoat · AS/NZS 4680 + AS/NZS 2312.1 · EN ISO 1461 + EN ISO 12944
HDG + powder coat (architectural colours)Galvanized, then polyester powder coat for visible public areas

الأسئلة المتكررة

When is side mounting better than top mounting?

When walkway width is tight, when the deck should not be drilled, or on stair stringers and mezzanine edges. Structurally it needs a stiffer edge member.

Are the holes in the steel drilled on site?

When the handrail ships with our structural steel the holes are made in the shop from the same model. For existing steel, the brackets can be drilled on site.

Can side- and top-mounted runs be mixed?

Yes – both use the same rails, fittings and toe boards and join at corners.

المشروع القادم

هل تخططون لمنشأة فولاذية في الخارج؟

أرسلوا إلينا مخططاتكم أو نموذج IFC – يرد فريق التسعير لدينا بنطاق التصنيع والجدول الزمني والسعر شاملاً التسليم.