Fabrication & Manufacturing

Certified structural steel fabrication in Vietnam – around 40,000 tonnes a year.

From the largest built-up members to small fittings, every component is cut, welded, blasted, painted and coded in our own plant under certified quality systems.

Our fabrication plant at Hai Son Industrial Park, Tay Ninh, produces components from the largest to the smallest and from simple to complex – including oversize and special structures – with a capacity of around 40,000 tonnes per year.

Fabrication follows certified quality and welding management systems recognised in our export markets: AS/NZS 5131 CC3 for Australia and New Zealand, EN 1090-2 EXC3 for Europe, ISO 3834-2 for welding quality, IAS AC472 for the US market and BC1 for Singapore. Quality is inspected from incoming material, through each production step, to the finished product.

含まれるもの

  • Hot-rolled sections, welded built-up members and bent plate: I/H beams, HSS, angles, channels, Z, tees, bars, rods and plate
  • Laser cutting of plates, end plates and holes; automatic welding of built-up members; SAW and FCAW welding
  • Every step performed by workers, supported by production supervisors and released by QC – full process on the factory page
  • Shot blasting and paint systems to the project specification; hot-dip galvanizing on request
  • Every member marked with its package code for traceable delivery and erection
  • Inspection from incoming material to finished product
  • Programs based on MBMA, ASTM, AISC, AWS and SSPC requirements

プロセス

  1. 01
    Material receiving

    Steel plate received and checked against the order and mill certificates.

  2. 02
    Laser cutting

    Plates cut by laser; end plates and connection plates cut and holed by laser.

  3. 03
    Fit-up & automatic welding

    Web and two flanges fitted up and welded automatically.

  4. 04
    Straightening

    Members straightened to tolerance.

  5. 05
    Rough assembly

    End plates at both ends and stiffeners tack-welded in position.

  6. 06
    Dimensional inspection

    Member measured against the shop drawing – hold point before final welding.

  7. 07
    Final welding

    All detail welds completed after dimensional release.

  8. 08
    Visual inspection & grinding

    Welds inspected, ground and deburred.

  9. 09
    Shot blasting

    Surface cleaned for coating.

  10. 10
    Painting

    Paint system applied, film thickness checked.

  11. 11
    Packing

    Members coded, bundled and listed.

  12. 12
    Dispatch

    Loaded and released from the factory.

よくある質問

Which certifications does the fabrication plant hold?

AS/NZS 5131 CC3, EN 1090-2 EXC3, ISO 3834-2, IAS AC472 and BC1 (Singapore). World Steel was the first company in Asia certified under IAS AC472.

What is your annual fabrication capacity?

Around 40,000 tonnes of structural steel per year.